Laserfiche WebLink
- Facility Permitted Tonnage: The permitted daily tonnage of 8,668 tons(or 46,080 tons per week)includes all materials <br /> that come through the gate (disposed waste and beneficial reuse materials)and the tonnages that are received at the <br /> transfer station, composting facility, and at the land spreading operation. <br /> -Alternative Daily Cover(ADC) Materials:The facility operator is approved to use ADC materials, as described in <br /> condition 17(q)of the governing solid waste facility permit(SWFP). Currently,the operator is using tarps and soil to <br /> cover the placed and compacted refuse on the daily work face. <br /> -Bird Control Measure:The operator use whistlers as bird control measure,during the bulk of the days of operation. <br /> There were no birds at the site, during the period of the inspection. From mid-April through October time period, the <br /> operator uses a Falconer for bird control measure. <br /> -Amendments to the Joint Technical Document(JTD):The JTD needs to be amended,to among others,describe the <br /> LFG monitoring plan which was approved in 2009,the new mid-April through October bird control measure, and other <br /> changes that the LEA may deem necessary. During the period of the inspection,the LEA and operations manager <br /> informed CalRecycle staff that a JTD Amendment application package was submitted to the LEA on August 8,2014 and <br /> was accepted by the LEA on August 22, 2014. <br /> -The operation at the facility was good at the time of the inspection. No violation and/or area of concern was noted <br /> during the inspection. <br /> PERMIT REVIEW: <br /> The next LEA established five year permit review for the landfill is June 17,2018. <br /> CLOSURE AND POSTCLOSURE MAINTENANCE PLAN (CPCMP): <br /> As required by 27 CCR, Section 21865, updates to the CPCMP have been submitted to the LEA with the application for <br /> JTD Amendment,which was accepted by the LEA on August 22,2014. <br /> NON-WATER CORRECTIVE ACTION COST ESTIMATE: <br /> As required in 27 CCR, Section 22103, updated corrective action estimate and updates to the CPCMP have been <br /> submitted to the LEA with the application for JTD Amendment,which was accepted by the LEA on August 22,2014. <br />