Laserfiche WebLink
ForwaKd landfill -3- 29 December 2011 <br /> San Joaquin County <br /> Figure 5. Borrow pit for the cover material. The Figure 6. The Discharger has prepared the <br /> Discharger is constructing the cover under the working face for the wet season. Only a small <br /> conditions of their Industrial storm water permit. area will be open to accept waste during the <br /> wet season. 10-foot high debris fences have <br /> been installed around the perimeter to catch <br /> any blowing debris. <br /> g <br /> t <br /> s rw <br /> Figure 7. The southern face of the Forward Figure 8. Forward landfill also operates a com- <br /> WMU is prepared for winter. The area has been posting operation. <br /> hydro-seeded, but with little rain, the germina- <br /> tion of the seeds still had not occurred. The liq- <br /> uid level with the Class II impoundment was <br /> below the 2-foot free-board limit. <br />