My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Construction Quality Assurance Report— WMU FU -13 <br />Forward Landfill <br />• 4.0 EARTHWORKS CONSTRUCTION <br />As the earthworks construction was implemented, GLA's CQA Monitors performed construction <br />monitoring and earthworks testing. This section describes the CQA tasks associated with the <br />construction of the earthworks components of the WMU FU -13 composite liner system. The <br />elements monitored and tested by GLA's CQA Monitors and discussed within this section <br />include preparation of the existing subgrade and placement of subgrade fill soils; placement of <br />the low permeable clay liner soils; installation of the LCRS coarse gravel and granular drainage <br />material; and placement of the operations layer soils. <br />The earthworks CQA activities performed by GLA for the WMU FU -13 composite liner <br />construction included: <br />• monitoring of the subgrade preparation; <br />• collecting samples of the subgrade fill soils for laboratory testing; <br />• monitoring and testing of the subgrade fill soils during placement; <br />• collecting samples of the low permeable clay liner soils for laboratory testing; <br />• monitoring and testing of clay liner soils during placement, including collection of in situ <br />• soil samples for laboratory permeability testing; <br />• reviewing geotechnical laboratory testing results for compliance with project <br />specifications; <br />• observing installation of the granular drainage material and coarse gravel for the LCRS; <br />• monitoring placement of protective operations layer soils, and <br />• monitoring the moisture conditioning and placement of the earth fill soils for the <br />termination berms. <br />4.1 EXCAVATION <br />The majority of the excavation was completed prior to GLA arriving on-site. Therefore, only <br />minor excavation and shaping of the slopes was required within WMU FU -13. Prior to <br />excavation, clearing and grubbing activities were conducted for removal of deleterious <br />materials such as grass, roots, or other organic vegetative materials. Upon completion of the <br />excavation, RJA and Associates surveyed the as -built subgrade. The survey was reviewed by <br />GLA for completeness. <br />4.2 SUBGRADE FILL/ BUTTRESS <br />• Subgrade/buttress fill soils were used in FU -13 on the 4:1 slope, bench, and 2:1 slope. The fill <br />9 Geo -Logic <br />ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.