Final Construction Quality Assurance Report—WMU FU-13 <br /> Forward Landfill <br /> soil was obtained from the Cell floor excavation. The soil was ripped and moisture conditioned • <br /> before being collected by scrapers for placement. Compaction was achieved by a CAT 825 <br /> sheepsfoot compactor and scraper traffic. Additional moisture was added as needed by water <br /> truck. Rough grading was accomplished by the CAT D6 w/GPS. Finish grading on the 4:1 slope <br /> was accomplished by a CAT 140H blade; and by a CAT D6 dozer on the 2:1 slope. Finish grade <br /> surveying was provided by RJA and Associates. <br /> CQA monitored all activities during placement of the slope areas and performed nuclear <br /> method moisture-density tests in subgrade/buttress fill soils placed on the 2:1 and 4:1 slopes. <br /> The Specifications require that the subgrade fill soils be compacted to a minimum 90%of ASTM <br /> D1557 (modified Proctor), at a moisture content within 4% of the Proctor OMC (Optimum <br /> Moisture Content). <br /> All of the subgrade/buttress fill soils were placed on the slope area. The Contractor built the 2:1 <br /> slope using the slope bench method. The Contractor used 637 CAT scrapers to transfer <br /> moisture conditioned subgrade fill soils from the floor cut area and spread it out in "thin" 6- <br /> inch to 8-inch loose lifts on the slope bench. Additional water was added in the fill as needed <br /> and compaction achieved by the CAT 825 sheepsfoot and scraper traffic. Each lift placed on the • <br /> floor was wheel-rolled by 2 loaded scrapers and then scarified by the CAT 825 before the next <br /> lift was placed. <br /> During placement of the subgrade fill soils, GLA's CQA Monitor obtained soil samples for <br /> laboratory testing. These test results were compared to the moisture-density tests performed <br /> in the field to assure that the material was being placed, moisture conditioned, and compacted <br /> according to the project Specifications. Approximately 50,000 cy of subgrade and buttress fill <br /> soils were placed on the slope areas of FU-13. The finished grade survey of the <br /> subgrade/buttress fill soils was performed by RJA and Associates. The laboratory tests and field <br /> testing results for the subgrade/buttress fill soils are included in Appendix C. <br /> Modified Proctor (ASTM D-1557): GLA's CQA Monitor performed 10 modified Proctors (ASTM <br /> D-1557A) on the subgrade/buttress fill soils, which corresponds to a frequency of 1 test per <br /> 5,000 cy. A summary of these test results is shown in Table 3, and all test results are included in <br /> Appendix C. <br /> Grain Size Analysis and Atterberg Limits of Subgrade Fill Soils: 11 sieve analyses (ASTM D422), <br /> and Atterberg limits tests (ASTM D4318), were performed on subgrade/buttress fill soils. A <br /> summary of the test results is also included in Table 3. Detailed results of these tests are • <br /> 10 Geo-Logic <br /> ASSOCIATES <br />