My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • carbon black dispersion (ASTM D-5596); <br />• thickness (ASTM D-5994); <br />• tensile properties (ASTM D-6693); <br />• asperity height (GRI GM -12); and <br />• interface shear strength testing. <br />• <br />Final Construction Quality Assurance Report— WMU FU -13 <br />Forward Landfill <br />A total of six 60 -mil thick HDPE geomembrane samples were tested for conformance. The six <br />samples consisted of 3 for the double -sided geomembrane and 3 for the single sided <br />geomembrane. Based on 525,000 ft2 of HDPE received, this testing frequency corresponds to <br />one test per 87,500 ft2 which satisfies the requirement of one test per 100,000 ft2. Results of <br />the conformance testing indicated that the materials met the requirements of the project <br />specifications. A summary of the conformance test results is included in Table 6. <br />In addition, large-scale direct shear testing was conducted on the clay/geomembrane and <br />geomembrane/geotextile interfaces (the GCL interface shear testing is discussed in Section 5.1). <br />Results of the conformance testing indicated that the materials met the requirements of the <br />project specifications. Detailed test results including the geomembrane/geotextile interface <br />shear tests are included in Appendix I. <br />5.3.2 Geomembrane Installation <br />5.3.2.1 Geomembrane Deployment <br />Surface Preparation: Prior to installation of the HDPE, GLA's CQA Monitor observed that the <br />GCL or compacted clay liner had been installed as required by the project Specifications and <br />there was no change in the surface condition that required repair work. <br />Layout Drawing: The liner contractor, Comanco, submitted a proposed panel layout drawing <br />that showed the general panel configurations and dimensions. These drawings were reviewed <br />and approved by GLA's Engineer of Record prior to the deployment of the HDPE geomembrane. <br />The as -built Panel Layout drawings are included in Appendix I. <br />21 Geo -Logic <br />ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.