Laserfiche WebLink
2-1 <br /> Stormwater Management <br /> As part of routine site maintenance, all stormwater control system features will be inspected <br /> and repaired as necessary. Special attention will be given to those interim and/or <br /> permanent stormwater control system features which divert, gather,and/or control run-on to <br /> the staged closure areas. Drainage control system which features the final stage closure <br /> will be integrated with the interim features utilized during active operations. <br /> Post Closure Gest Estk4�&� <br /> The 2002 post closure eest estimate was updated to ref!eGt 2008 eests and ineludes the <br /> newly required additienal baGk up Gest information under 27 GGR. it was determined that <br /> ne ehanges to the post elesuFe oest estimate are necessary to implement the staged elesure <br /> of the FL. The 2008 post E)IesuFe eest estimate is inGluded herein as Table 4. OnE)e a giveR <br /> stage is Gempleted and the aFea is certified as elesed, then pest closure maintenanee. <br /> aetffivdt*es eensistent with the 2002 PGPGMP and Amendments will eemmenee. POst c-!E)sUFe <br /> that-the site ne In'n geF poses athreat ate e public and- enyirenmocnnri <br /> . <br /> Forward Landfill SWT Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\appendices\app a-pcpcmp 2013\text\pcpcmp amend <br /> 2013.doc <br />