Laserfiche WebLink
2-1 <br /> 2.0 PRELIMINARY POST-CLOSURE MAINTENANCE PLAN AMENDMENT <br /> The 2002 PFel;m;naFy PlaR PCPCMP prepared by BAS, Lewis Engineering, and GLA was <br /> subsequently updated with PCPCMP Amendment No. 4-3 of the DGDGn I-Pt Wj , 2008). As <br /> part of the Five-Year Permit Review, the post-closure maintenance cost estimate has been <br /> updated and is included as Table 4. The post-closure maintenance cost estimate is also <br /> discussed in Section 1.9. <br /> A eepy of the updated post clesure maintenance eest estimate is included as Table 4 and <br /> FnatGhes the estimate On--Ai;^rE Amendment Alr-rrvTof the 2002 PGPGMP <br /> The FL will be closed in tee-several stages over the life of the landfill. Upon completion of <br /> closure construction activities and certification, partial closure post-closure monitoring and <br /> maintenance will begin as part of ongoing active landfill operations. Once the entire FL is <br /> closed (after the last staged closure area is completed), the 30-year post-closure <br /> maintenance period will begin. It should be noted that Rpost-closure monitoring and <br /> maintenance procedures are outlined in the 2002 PCPCMP (BAS). <br /> The following discussion presents items of special note which will be carried out during the <br /> post-closure maintenance period in support of each staged closure area where appropriate: <br /> Landfill Gas Control and Monitoring <br /> The landfill gas control system (extraction wells) will be expanded as the FL is developed. <br /> Therefore, the gas control system will be placed prior to completion of each staged closure <br /> area. The system will be modified as discussed in this Amendment (Amendment No. 4-3) <br /> and the 2002 PCPCMP to accommodate placement of the final cover duFin4at the final <br /> partial (staged) closure-areacage`:1+. <br /> Permanent landfill as migration monitoring probes have meady been installed aFE)Und the <br /> perimeter of the ref�aotpF4A--to accommodate the revised facility boundaryin <br /> accordance with 27 CCR. Additional probes may be added as necessary. <br /> Surface; and subsurface and—system monitoring and gas control system <br /> adjustments/modifications will be conducted during post-closure maintenance to provide <br /> compliance with applicable State and Federal regulations. <br /> Settlement Monitoring <br /> Two-pPermanent survey monuments will be installed during closure of Stage I (A, B and Q. <br /> An aerial photographic survey will be wed-performed upon completion of each ^I�fe <br /> area's stage) closure construction activities. a In accordance with 27 CCR requirements, <br /> the operator will update the aerial survey of the landfill once theFevery five years <br /> duFm +g�- hroughout the post closure maintenance period to tragi, settlement. If additional fill <br /> contour information is needed, it should be noted that aerial flyovers will be conducted <br /> annually throughout active refuse disposal operations. <br /> Forward Landfill SWT Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\appendices\app a-pcpcmp 2013\text\pcpcmp amend <br /> 2013.doc <br />