Laserfiche WebLink
i <br /> FORWARD LANDFILL <br /> PRELIMINARY CLOSURE/POST-CLOSURE MAINTENANCE PLAN <br /> AMENDMENT NO. 4 <br /> TABLE OF CONTENTS <br /> 1.0 PRELIMINARY CLOSURE PLAN AMENDMENT 1-1 <br /> 1.1 Introduction 1-1 <br /> 1.2 Closure Sequencing 1-1 <br /> 1.3 Maximum Extent of Landfill That Will Ever Require Closure 1-4 <br /> 1.4 Closure Implementation 1-5 <br /> 1.5 Estimate of Closure Date 1-6 <br /> 1.6 Site Security 1-7 <br /> 1.7 Post Closure End Use 1-7 <br /> 1.8 Closure Cost Estimate 1-7 <br /> 1.8.1 Final Cover 1-7 <br /> 1.8.2 Final Cover Construction Quality Assurance <br /> Monitoring and Testing 1-8 <br /> 1.8.3 Drainage Control System 1-8 <br /> 1.8.4 Landscaping and Erosion Control 1-8 <br /> 1.8.5 Gas Control System 1-8 <br /> 1.8.6 Site Security 1-8 <br /> 1.8.7 Structure Removal/Decommissioning of Environmental Control <br /> Systems 1-8 <br /> 1.8.8 Gas Migration Monitoring System 1-8 <br /> 1.8.9 Groundwater Monitoring System 1-9 <br /> 1.8.10 Engineering Design 1-9 <br /> 1.8.11 Construction Management 1-9 <br /> 1.8.12 Partial Final Closure and Post-Closure Maintenance <br /> Plan Preparation 1-9 <br /> 1.8.13 Contingency 1-9 <br /> 1.9 Post-Closure Maintenance Cost Estimate 1-9 <br /> 1.10 Demonstration of Financial Assurance 1-10 <br /> 1.11 California Environmental Quality Act (CEQA) Documentation 1-10 <br /> 2.0 PRELIMINARY POST-CLOSURE MAINTENANCE PLAN AMENDMENT 2-1 <br /> 3.0 PROFESSIONAL CERTIFICATION OF ACCURACY 3-1 <br /> Forward Landfill SWT Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\appendices\app a-pcpcmp 2013\toc.docx <br />