Laserfiche WebLink
ii <br /> TABLES <br /> Table 1 Staged Closure Matrix <br /> Table 2 Closure Implementation Schedule - 187.6-Acre Closure Area <br /> Table 3 Closure Cost Estimate Summary - 187.6-Acre Closure Area <br /> Table 4 Annual Post-Closure Maintenance and Monitoring Cost Estimate Summary <br /> FIGURES <br /> Figure 1 Closure Stage I <br /> Figure 2 Closure Stage 11 <br /> Figure 3 Closure Stage III <br /> Figure 4 Closure Stage IV <br /> Figure 5 Closure Stage V <br /> Figure 6 Closure Stage VI <br /> Figure 7 Closure Stage VII <br /> Figure 8 Closure Stage VIII <br /> Figure 9 Final Cover Transition Between Lined Area Stages Typical Bench Detail <br /> ATTACHMENT <br /> Attachment 1: Stage IA Partial Final Closure/Post-Closure Maintenance Plan <br /> (BAS, June 2005) -Text/Tables/Figures only; Entire Document on CD-ROM <br /> Attachment 2: 2011 Stage IB Partial Final Closure/Post-Closure Maintenance Plan <br /> (SWT, June 2011) - Text/Tables/Figures only; Entire Document on CD-ROM <br /> Attachment 3: Closure and Post-Closure Cost Estimates Back-Up Data/Documentation <br /> (SWT, 2013) <br /> Attachment 4: Non-Water Release Corrective Action Plan (GLA, 2011) <br /> Forward Landfill SWT Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\itd-5 yr pr 2013\appendices\app a-pcpcmp 2013\toc.docx <br />