ATTACHMENTIA <br /> BID SCHEDULE <br /> FINAL CLOSURE CONSTRUCTION PROJECT AT THE <br /> BIG BEAR SANITARY LANDFILL <br /> FINAL CLOSURE CONSTRUCTION Engineer's Estimate Road BWldars,I-. <br /> Const <br /> Note Item No. Description Qty Unit Unit Cost Total Unitcost Total <br /> 1A MOBILIZATION 1 LS <br /> $313,000.00 $313,000.00 <br /> 1B SEASONAL DELAY-DE-MOBILIZATION/RE-MOBILIZATION/SITE MAINTENANCE 1 LS $53,700.00 $53,700.00 <br /> 2 T&M ALLOCATION 1 T&M 5300,000 $300,000 $300,000.00 $300,000.00 <br /> 3 CONSTRUCTION SUPPORT FACILITIES 1 LS $27,200.00 $27,200.00 <br /> 4 SURVEY 1 LS $90,000.00 $90,000.00 <br /> 1 1 5 CLEARING AND GRUBBING 29 AC $857.00 $24,853.00 <br /> 6 WASTE REMOVAL AND RECONSOLIDATION 10,000 CY <br /> $5.25 $52,500.00 <br /> 7 FOUNDATION LAYER SUBGRAOE/FINAL COVER SUBGRADE PREPARATION 1,325,700 SF $0.10 $132,570.00 <br /> 8A UNCLASSIFIED EXCAVATION 16,000 CY $2.75 $44,000.00 <br /> BB UNCLASSIFIED FILLIFOUNDATION FILL SOIL MATERIAL-SLOPE,BENCHES, <br /> PERIMETERIACCESS ROADS 30,000 CY $6.90 $207,000.00 <br /> 9 FOUNDATION LAYER-BENCH,PERIMETERIACCESS ROAD,AND DECK 270,000 j SF $0.41 $110,700.00 <br /> 9 10A COMPACTED FINAL COVER-SLOPE(PER DETAIL 1/131) 1,056,500 SF $0.58 $612,770.00 <br /> 9 10B FINAL COVER-SLOPE-IMPORT SOIL(PER DETAIL 1/Dl)'-(COMPACTED 36,000 CY $21.00 $756,000.00 <br /> VOLUME <br /> 9 10C LOCAL IMPORT FOR OTHER SITE SOIL NEEDS' 44000 CY $12.00 $528,000.00 <br /> FINAL COVER SECTION-DECK(PER DETAIL VD2) <br /> 4 i i 60 MiL LLDPE GEOMEMBRANE-DECK(PER DETAIL 3/01) 110,000 SF $0.60 $66,000.90 <br /> 14 12 DRAINAGE GEOCOMPOSITE-DECK 110,000 So 53 $58,300.00 <br /> 21 13 HDPE EDGE DRAIN-DECK 1,520 LF $4.10 $6,232.00 <br /> 14 14 PROTECTIVE SOIL COVER(PSC)-DECK 110,000 SF $0.45 $49,500.00 <br /> FINAL COVER SECTION-BENCH(PER DETAIL VDI) <br /> 15 15 60 MIL LLDPE GEOMEMBRANE-BENCH(PER DETAIL 71131) 92,500 SF $0.63 $58,275.00 <br /> 15 16 GEOCOMPOSITE-BENCH(PER DETAIL 7/131) 92,500 SF $0.55 $50,875.00 <br /> 21 17 HDPE EDGE DRAIN BENCH COLLECTOR(PER DETAIL 7102) 8,650 LF $4.10 $35,465.00 <br /> 15 18 PROTECTIVE SOIL COVER(PSC)-BENCH 92,500 SF $0.51 $47,175.00 <br /> FINAL COVER SECTION-PERIMETERIACCESS ROAD(PER DETAIL 2871) <br /> 10 19 66013MIL LLDPE GEOMEMBRANE-PERIMETERIACCESS ROAD(PER DETAIL 67,000 SF $0.63 $42,210.00 <br /> 21) <br /> 10 20 GEOCOMPOSITE-PERIMETERIACCESS ROAD(PER DETAIL 2/01) 66,986 SF $0.54 $36,17244 <br /> 21 21 HDPE EDGE DRAIN PERIMETERIACCESS ROAD COLLECTOR(PER DETAIL 1,682 LF $4.00 $6,728.00 <br /> 78)2) <br /> 10 22 PROTECTIVE SOIL COVER(PSC)-PERIMETERIACCESS ROAD 67,000 SF $0.51 $34,170.00 <br /> 10 2,1 4'ASPHALT CONCRETE/6'CRUSHED MISCELLANEOUS BASE- 34,600 SF $2.60 $89.%0.00 <br /> PERIMETERIACCESS ROAD(PER DETAIL 2/D1) <br /> 17 24 TOP DECK BERM(PER DETAIL 8/131) 1,090 LF $4.80 $5,232.Do <br /> 18 25 TOP DECK BERM OUTLET(PER DETAIL 301) 2 FA $3,635.00 $7,270.00 <br /> 6 26 CONSTRUCT 1.5:1 REINFORCED EARTH SLOPE(PER DETAIL 1134) 22,000 SF $3.00 $66,000.00 <br /> 7 27A SEGMENTAL CONCRETE BLOCK RETAINING WALL SYSTEM(PER DETAIL 2/D3) 5,500 SF $25.40 $139,700.00 <br /> 7 27B SEGMENTAL CONCRETE BLOCK RETAINING WALL SYSTEM(PER DETAIL 3103) 1,970 SF $26.00 $51,220.00 <br /> 8 28 CONCRETE V-DITCH AT RETAINING WALL(PER DETAIL 3/03) 1,245 LF $12.00 $14,940.00 <br /> 16 29 IFINAL COVER KEY AT THE LIMIT OF WASTE(PER DETAIL 3802) 3,230 LF 52.70 $8,721.00 <br /> 20 30A INSTALL NEW SECURITY FENCE PER APWA STD PLAN 600.2 2,670 LF $20.00 $53,400.00 <br /> 4 30B INSTALL TEMPORARY SECURITY FENCE PER APWA STD PLAN 600-2 1,335 LF $8.60 $11,481.00 <br /> 12 31A TRAPEZOIDAL DOWNORAIN/CHANNEL(b=1,D=1.5,2=1.1)(PER DETAIL 5 O'1 5 94] SF <br /> 12 31B TRAPEZOIDAL DOW NDRAIN/CHANNEL(b=1,D=2.5,Z=1:1)(PER DETAIL 5101) 3,900 SF $3.60 $14,040.00 <br /> 41 31C CONCRETE BENCH CHANNEL(0=2.0,Z1=1,Z2=12) 3,200 SF $3.60 $11,520.00 <br /> 11 1 32 IDOWNDRAIN BENCH/ROAD CROSSING(PER DETAIL WWI 5,100 SF 56.00 $30,600.00 <br /> 13 33 SPLASH WALL(PER DETAIL 6/D1) 90 LF $33.00 $2,970.00 <br /> 24 34 MODIFIED HEADWALL(WING TYPE)PER SAN BERNARDINO COUNTY STD 209 1 EA $3,500.00 $3.500.00 <br /> (PER DETAIL 8/02) <br /> 27 35 REMOVE EXISTING CSP CULVERT;INSTALL 42"CORRUGATED SMOOTH 41 LF $86.00 $3,5. " <br /> INTERIOR WALL PIPE WITH BELL AND SPIGOT JOINTS(PER DETAIL 8/02) <br /> 28 36 MODIFIED'U'HEADWALL PER SAN BERNARDINO COUNTY STD 209A(PER 1 EA $3,500.00 $3,500.00 <br /> DETAIL 81D2) <br /> 26 37 RIP RAP PAD(PER DETAIL 5/02) 175 SF $6.00 $1,050.00 <br /> FLEXIBLE POST DELINEATORS SURFACE MOUNT AT 200N CENTER PER CAL <br /> 25 38 TRANS STD.A-73C 10 EA E24.OD $240.00 <br /> 31 39 B"AC CURB PER SAN BERNARDINO COUNTY STD 117 730 LF $8.D0 $5,840.00 <br /> 22 40 jHDPE BOOT(PER DETAIL 5/03) 9 EA $500.00 $4,SOO.OD <br />