Laserfiche WebLink
ATTACHMENT IA <br /> BID SCHEDULE <br /> FINAL CLOSURE CONSTRUCTION PROJECT AT THE <br /> BIG BEAR SANITARY LANDFILL <br /> 22 41 6'HDPE PIPE OUTLET AT LLDPE COVER LIMIT(PER DETAIL 4/D3) 380 LF $16.00 $6,080.00 <br /> 29 42 4"AC OVER 6"CMB 68,000 SF $2.20 $149,600.00 <br /> 34 43 SETTLEMENT MONUMENTS(PER DETAIL 2/D2) 3 EA $1,100.00 $3,300.00 <br /> 32 44 CABLE RAIL FENCE 2,340 LF <br /> $13.00 $30,420.00 <br /> 33 45 PORTABLE CONCRETE BARRIERS(2 SEGMENTS IN LENGTH) 1 EA $2,000.00 $2,000.00 <br /> 30 46 12"x12"DEEP LIFT AC PAVING 420 LF <br /> $22.00 $9,240.00 <br /> 23 47 CONSTRUCT DECK TO SLOPE COVER TRANSITION(PER DETAIL 6/02) 660 LF $3.20 $2,112.00 <br /> 35 48 HYDROSEED SLOPE AREAS PER PROJECT SPECIFIC 22.6 AC $3,100.00 $70,060.00 <br /> 36 49 DRILL SEED DECK AREAS PER PROJECT SPECIFIC 2.5 AC $1,300.00 $3.250.00 <br /> 37 50 INSTALL FIBER ROLLS(PER DETAIL 2/05 AND 31D5) 25,220 LF $1.70 $42,874.00 <br /> 38 51 INSTALL SILT FENCE(PER DETAIL 4/DS) 87 LF $3.00 $261.00 <br /> 39 1 52 CONSTRUCT SANDBAG CHEVERON(PER DETAIL 1/05) 153 EA $24.00 $3,672.00 <br /> 40 53 ROCK EROSION PROTECTION ON BENCHES(PER DETAIL 7/01) 3,160 LF $4.50 $14,220.00 <br /> 42 54 GUARD POST(PER DETAIL 6/04) 2 EA $300.00 $600.00 <br /> 43 1 55 DOWNDRAIN TRANSITION TO PERIMETER ROAD(PER DETAIL 117) 3 EA $360.00 $1,D80.00 <br /> SUBTOTAL= $4,633,352.44 <br /> LANDFILL GAS COLLECTION AND CONTROL SYSTEM <br /> hem No. Description Oty, Unit Unit Cost Total Unit Cost Total <br /> 1 Mobilization/Demobilization 1 LS $72.100.00 $72.100.00 <br /> 2 Drill well borings for sixty-seven(67)gas extraction wells(24-inch diameter hole, <br /> drilling only,and Inclusive of waste disposal and tipping fees) 3,263 VF $55.00 $179,465.00 <br /> 3 Install sixty-seven(67)Gas Extraction Wells(well casing,backfill material, 3,263 VF $31.00 $101,153.00 <br /> cement/bentonite slurry,and associated fillings per details 1,2,3,Sheet G9) <br /> 4 Install 5bentonite well seal at bottom of boring,as needed 20 EA $600.00 $12,000.00 <br /> 5 Install remote wellhead per detail VG9 56 EA <br /> $200.00 $11,200.00 <br /> 6 Install wellhead per detail 2 or NG9 11 EA $725.00 $7,975.00 <br /> 7 Install horizontal wellhead in vault per detail 11G10 61 EA $850.00 $51,850.00 <br /> 8 Install horizontal collector wellhead per detail 6/G11 3 EA $72500 $2,175.00 <br /> 9 Install traffic-rated vault per detail 1/G8 3 EA $4,900.00 $14,700.00 <br /> 10 Install lightweight vault per detail VG8 13 EA <br /> $4,400.00 $57,200.00 <br /> 11 Install condensate pump station per detail 2IG12 1 EA $17.000.00 $17,000.00 <br /> 12 Install condensate pump station per detail 1/G12 2 EA $19,000.00 $38,000.00 <br /> 12A 'Lower Mound'-Install condensate pump station per detail 1/G12 1 EA $19,000 00 $19,00000 <br /> 13 Install 1 1/2"SDR 9 HDPE Compressed Air line pipe and fittings,in common trench, <br /> 2,820 LF $1.80 $5,076.00 <br /> per detail 2/G8 <br /> 14 Install 1'/h-isolation valve per detail 4/G10 1 EA $650.00 $650.00 <br /> 15 Install 2"diameter SDR 11 HDPE pipe and fittings,n common trench(condensate or 3,000 LF $1.80 $5,400.00 <br /> gas),per detail 2/G8 <br /> 16 Install 2'Isolation valve per detail 4/G10 1 Eq <br /> $700.00 $700.00 <br /> 17 Install Bollard per detail 4/G9 30 EA $650.00 $19,50000 <br /> 18 Install 4'SDR 17 HDPE pipe and fittings,below grade,per detail 3/G8 12,880 LF $9,50 $122,360.00 <br /> 18A "Lower Mound"-Install 4"SDR 17 HDPE pipe and fittings,below grade,per detail 750 LF $15.00 $11,250.00 <br /> 3/G8 <br /> 19 Install 4"Horizontal Gas Collector per detail 2/G11(inclusive of waste disposal and 1,085 LF $3300 $35,805.00 <br /> lipping fees) <br /> 20 Install 4'Horizontal Gas Collector per detail 3 and 4,G11(Inclusive of waste disposal 1,030 LF 541.00 $42,230.00 <br /> and tipping fees) <br /> 21 Install 8'SDR 17 HDPE pipe and fittings,below grade per detail 2/G8 4,505 LF $20.00 $90,100.00 <br /> 21A "Lower Mound*-Install 8"SDR 17 HDPE pipe and fittings,below grade per deatil <br /> 2/G8 820 LF $26.00 521,320.00 <br /> 22 Install 8"HDPE Flange Adapter,back-up ring and hardware 1 EA $140.00 $140.00 <br /> 23 Install 8'Valve and appurtenances per detail 4/G8 4 EA $1,500.00 $6,000.00 <br /> 24 Install 8"PVC Blind Flange 1 EA $70.00 $70.00 <br /> 25 Install eight(8)LFG Monitoring Probes and appurtenances per sheet G13 920 VF $125.00 $115,000.00 <br /> 26 Install Header Sample Port 2 EA $18000 $360.00 <br /> 27 Saw Cut 8 Replacement of AC Pavement 1,220 SF <br /> $8.00 $9,760.00 <br /> 28 Drilling Refusal for LFG Extraction Wells(10%) 350 VF $35.00 $12,250.00 <br /> 29 Drilling Standby(when approved by SW MD) N/A I HR 0 $550.00 <br /> SUBTOTAL= 51,081,789.00 <br /> FINAL CLOSURE CONSTRUCTION SUBTOTAL 54,633,35244 <br /> LANDFILL GAS COLLECTION AND CONTROL SYSTEM SUBTOTAL $1,081,789.00 <br /> TOTAL BID: $5,715,141.44 <br />