My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l.6 WATER FOR COMPACTION AND MOISTURE CONTROL <br /> A. Water for use in compaction and dust control will be provided to the <br /> EARTHWORK CONTRACTOR at Forward's well standpipe as shown on the <br /> Construction Drawings. The EARTHWORK CONTRACTOR shall be <br /> responsible for transport of water from well. <br /> 1.7 SHORING, SHEETING, BRACING, AND SLOPING <br /> A. Install and maintain shoring, sheeting, bracing, and sloping necessary to support <br /> the sides of excavations, to keep and to prevent any movement that may damage <br /> adjacent facilities, or endanger life and health. Install and maintain shoring, <br /> sheeting, bracing, and sloping as required by OSHA and other applicable <br /> governmental regulations and agencies. <br /> 1.8 EXCAVATION SAFETY <br /> A. The EARTHWORK CONTRACTOR shall be solely responsible for making all <br /> excavations in a safe manner. Provide appropriate measures to retain excavation <br /> sideslopes and prevent rock falls to ensure that persons working in or near the <br /> excavation are protected. <br /> 1.9 CODES, ORDINANCES,AND STATUTES <br /> A. The EARTHWORK CONTRACTOR shall be familiar with, and comply with, all <br /> applicable codes, ordinances, statutes, and bear sole responsibility for the <br /> penalties imposed for noncompliance. <br /> 1.10 TOLERANCES <br /> A. All material limits shall be constructed within the tolerances specified in Section <br /> 01410, SURVEYS. Minimum thicknesses and slopes shall be as shown on the <br /> Construction Drawings. All grading shall be performed to maintain slopes and <br /> drainage as shown. No reverse slopes will be permitted. <br /> PART2 PRODUCTS <br /> 2.1 GENERAL <br /> A. Provide all labor, materials, and equipment necessary to accomplish the Work <br /> specified in this section. <br /> Forward Landfill WMU FU-14 <br /> 02300 4 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.