My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. If the clay liner becomes softened due to moisture changes, scarify and mix <br /> full depth of damage, adjust water content to specified value, and recompact <br /> as previously specified, at the EARTHWORK CONTRACTOR's sole <br /> expense. <br /> F. Field Quality Control <br /> 1. As the clay liner is being placed and compacted, the QA/QC <br /> CONSULTANT will be monitoring the construction activities and soil <br /> properties as described in the CQA Manual. Acceptance testing frequencies <br /> are defined in the CQA Manual. The EARTHWORK CONTRACTOR <br /> shall cooperate with the QA/QC CONSULTANT in obtaining samples for <br /> the CQA acceptance testing, and in leveling and backfilling areas designated <br /> by the QA/QC CONSULTANT. <br /> 2. The location of acceptance testing shall be determined solely by the QA/QC <br /> CONSULTANT. The QA/QC CONSULTANT may test any lift of the clay <br /> liner at any time, location,or elevation. <br /> 3. Holes left by sampling and testing shall be backfilled by the EARTHWORK <br /> CONTRACTOR using the Clay Liner Material. <br /> 4. If acceptance testing by the QA/QC CONSULTANT indicates that the Clay <br /> Liner Material does not meet specified requirements for density, water <br /> content, or lift thickness, the EARTHWORK CONTRACTOR shall <br /> terminate material placement until corrective measures are taken at the <br /> EARTHWORK CONTRACTOR's sole expense. Corrective measures <br /> could include, but are not limited to, scarifying and recompacting of <br /> material or removal of material that does not meet the requirements of these <br /> Specifications. <br /> S. If acceptance testing by the QA/QC CONSULTANT indicates that the Clay <br /> Liner Material does not meet specified requirements for particle size, <br /> classifications, plasticity, or hydraulic conductivity, then the Clay Liner <br /> Material which failed will be retested. If the second test results indicate <br /> failure to meet the specified requirements,the QA/QC CONSULTANT may <br /> order a design modification or the removal, disposal, and replacement of the <br /> unsuitable Clay Liner Material. <br /> 6. Clay Liner Acceptance: Final acceptance of the clay liner will be based on <br /> acceptance and control tests made on completed Work, on material samples <br /> taken from the completed layer, and the thickness as calculated from the top <br /> of subgrade and top of clay liner surveys. Acceptance testing for final <br /> acceptance shall be performed by the soil testing laboratory in accordance <br /> with these Specifications and the CQA Manual. <br /> G. Protection: <br /> I. Do not route or allow construction traffic, except as necessary, on top of <br /> clay liner once material has been placed and compacted. <br /> 2. Constructed clay liner shall be maintained to meet the requirements of this <br /> Specification until final completion and acceptance of the Work. This shall <br /> include all measures to prevent erosion. During seasonal or other extended <br /> shutdowns, all exposed surfaces shall be protected as detailed in Article 3.1, <br /> Forward Landfill WMU FU-14 <br /> 02300 16 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.