My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. The top surface of the final lift shall be bladed smooth and recompacted <br /> with a non-vibratory steel drum roller to produce a smooth top surface free <br /> from tire or roller marks, holes, and depressions more than 1/2 inch deep. <br /> The top surface shall conform to the lines and grades shown on the <br /> Construction Drawings. <br /> 10. At the end of each construction day's activities, completed lifts or sections <br /> of compacted clay liner shall be sealed by rolling with a rubber tired, or <br /> smooth drum,rollers and sprinkled with water as needed. <br /> 11. Upon completion of the clay liner, the GEOSYNTHETICS <br /> CONTRACTOR shall place geomembrane lining as specified in <br /> Section 02778, HIGH DENSITY POLYETHYLENE (HDPE) <br /> GEOMEMBRANE. The OWNER shall survey the termination edges of the <br /> HDPE Geomembrane at a minimum 75-foot interval. <br /> 12. Prepare the top surface of the clay liner for placement of the geomembrane <br /> liner by removing rock, debris, cracks, or other structural irregularities that <br /> could puncture or cause undue stress on the geomembrane liner. The top <br /> surface will be inspected and approved by the QA/QC CONSULTANT and <br /> the GEOSYNTHETICS CONTRACTOR prior to placement of the <br /> geomembrane lining. <br /> 13. All corners/edges of the finished clay liner shall be rounded in preparation <br /> for geomembrane lining installation. <br /> D. Moisture Control <br /> 1. During compacting operations, maintain water content in each lift of the <br /> Clay Liner Material within range of 3 to 5 percent greater than the optimum <br /> water content. <br /> 2. If Clay Liner Material is too dry, add water to material by sprinkling, then <br /> mixing or discing to make moisture content uniform throughout lift. <br /> 3. Do not attempt to compact Clay Liner Material that contains excessive <br /> moisture. Aerate material by blading, discing, harrowing, or other methods, <br /> to hasten drying process. <br /> E. Maintaining Clay Liner Condition: <br /> 1. Following completion of the clay liner, it shall be maintained in a moist <br /> condition by sprinkling with water or covering with plastic sheeting until <br /> the overlying components of the liner system are placed. The <br /> EARTHWORK CONTRACTOR shall be responsible for, and shall repair <br /> and replace at his own expense, any portion of the clay liner that has dried <br /> out or been damaged by unfavorable weather conditions or by his <br /> construction operations. <br /> 2. Cracks that form in the hydraulic barrier layer shall be repaired. Repair <br /> shall consist of mixing to the full depth of the crack, moisture conditioning, <br /> and recompacting to the same relative compaction as the surrounding clay <br /> liner at the EARTHWORK CONTRACTOR's sole expense. <br /> Forward Landfill WMU FU-14 <br /> 02300 15 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.