My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
range of 3 to 5 percent greater than the optimum water content. <br /> 2. If Clay Earthfill Material is too dry, add water to material by sprinkling, <br /> then mixing or discing to make moisture content uniform throughout lift. <br /> 3. Do not attempt to compact Clay Earthfill Material that contains excessive <br /> moisture. Aerate material by blading, discing, harrowing, or other methods, <br /> to hasten drying process. <br /> D. Field Quality Control <br /> 1. As the material is being placed and compacted, the QA/QC CONSULTANT <br /> will be monitoring the construction activities and soil properties as <br /> described in the CQA Manual. Acceptance testing frequencies are defined <br /> in the CQA Manual. The EARTHWORK CONTRACTOR shall cooperate <br /> with the QA/QC CONSULTANT in obtaining samples for the CQA <br /> acceptance testing, and in leveling and backfilling areas designated by the <br /> QA/QC CONSULTANT. <br /> 2. Holes left by sampling and testing shall be backfilled by the EARTHWORK <br /> CONTRACTOR using the Clay Erathfill Material. <br /> 3. If acceptance testing by the QA/QC CONSULTANT indicates that the <br /> material does not meet specified requirements for density, water content, or <br /> lift thickness, the EARTHWORK CONTRACTOR shall terminate material <br /> placement until corrective measures are taken at the EARTHWORK <br /> CONTRACTOR's sole expense. Corrective measures could include, but are <br /> not limited to, scarifying and recompacting of material or removal of <br /> material that does not meet the requirements of these Specifications. <br /> E. Protection: <br /> 1. The clay earthfill shall be protected from any contamination which increases <br /> the hydraulic conductivity. Any contaminated material shall be removed <br /> and replaced at no cost to the OWNER. <br /> 3.10 COARSE GRAVEL MATERIAL <br /> A. General Requirements: Coarse Gravel shall be placed around leachate collection <br /> pipe and in sump area as shown on the Construction Drawings and should be fully <br /> encapsulated by geotextile. <br /> B. Coarse Gravel Placement: <br /> 1. The HDPE geomembrane lining underlying the Coarse Gravel shall be <br /> inspected and approved prior to placement of the Coarse Gravel. <br /> Forward Landfill WMU FU-14 <br /> 02300 18 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.