My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Equipment used to place and compact the coarse gravel shall be not travel <br /> directly on the underlying geomembrane. <br /> 3. The EARTHWORK CONTRACTOR shall use low ground pressure <br /> equipment to place the coarse gravel. A minimum thickness of I ft of <br /> material is required between a low ground pressure dozer (such as a wide <br /> pad Caterpillar D-3 bulldozer or equivalent) and an underlying geoembrane. <br /> A minimum thickness of 3 ft of material is required between rubber-tired <br /> vehicles and underlying geosynthetics. In areas of heavy vehicle traffic, <br /> such as access ramps, the material thickness should be at least 3 ft. In any <br /> case,the following table shall be complied with during construction: <br /> Maximum <br /> Equipment Ground Pressure Initial Lift Thickness <br /> (psi) (ft) <br /> <5 0.5 <br /> 5 1.0 <br /> 10 1.5 <br /> 20 2.0 <br /> >20 >3.0 <br /> 3. Method of dumping and spreading materials shall be approved by the <br /> QA/QC CONSULTANT and shall ensure uniform distribution of the <br /> material and prevent damage to the underlying geotextile and geomembrane <br /> lining. Approval does not absolve the EARTHWORK CONTRACTOR of <br /> responsibility for damage to underlying components. <br /> 4. Compaction of Coarse Gravel shall be accomplished by shovel-slicing <br /> during dumping, and taking necessary precautions to prevent damage to <br /> underlying geosynthetics. <br /> C. Quality Control: <br /> 1. General: As the Coarse Gravel material is being placed, the QA/QC <br /> CONSULTANT will be monitoring the construction activities and soil <br /> properties. If acceptance tests conducted by the QA/QC CONSULTANT <br /> indicate that the Coarse Gravel does not meet specified requirements, the <br /> EARTHWORK CONTRACTOR shall terminate material placement until <br /> corrective measures are taken. <br /> 2. Coarse Gravel Acceptance: Final acceptance of the Coarse Gravel will be <br /> based on all tests made on completed Work or on samples of material taken <br /> from the completed layer. Testing for final acceptance shall be performed <br /> by the QA/QC CONSULTANT in accordance with these Specifications and <br /> the CQA Manual. <br /> Forward Landfill WMU FU-14 <br /> 02300 19 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.