My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
materials damaged during placement and compaction of the berms, at the <br /> EARTHWORK CONTRACTOR's sole expense. <br /> C. All geosynthetic materials underlying the berms will be inspected and approved <br /> by the QA/QC CONSULTANT prior to placement of the general or clay earthfill. <br /> D. During all compacting operations, maintain optimum practicable moisture content <br /> required for compaction purposes in each lift of fill. Maintain uniform moisture <br /> content throughout the lift. Insofar as practicable, add water to the material at the <br /> site of excavation. Supplement, if required, by sprinkling the general or clay <br /> earthfill. At the time of compaction, the water content of the material shall be at <br /> the optimum moisture content,f4 percentage points per ASTM D1557. <br /> E. Do not attempt to compact general or clay earthfill material that contains <br /> excessive moisture. Aerate material by blading, discing, harrowing, or other <br /> methods,to hasten the drying process. <br /> 3.17 DITCHES AND TRENCHES <br /> A. Place general earthfill, as necessary, and excavate ditches and trenches to achieve <br /> grade and dimensions shown on the Construction Drawings. <br /> B. Excavate, as necessary, to repair any existing drainage structure damaged during <br /> construction. <br /> C. Minimum width of trenches shall be 12-inches greater than outside diameter or <br /> width of pipe. Maximum trench width is unlimited, unless otherwise shown or <br /> specified, or unless width will cause damage to existing facilities, adjacent <br /> property,or completed work. <br /> D. Pipe bedding grooves shall be semi circular, trapezoidal, or 90 degree V. The <br /> grooves shall be excavated or plowed into the trench bottom. Forming groove by <br /> compaction will not be acceptable. <br /> 3.18 PLYWOOD SHEETING <br /> A. Install at the locations shown on the Construction Drawings. <br /> 3.19 SITE GRADING <br /> A. Perform all earthwork to the lines and grades as shown on the Construction <br /> Drawings and/or established by the DESIGN ENGINEER. Shape,trim, and finish <br /> slopes of channels to conform with the lines, grades, and cross sections shown. <br /> Make slopes free of all exposed roots and stones exceeding 3-inch diameter that <br /> are loose and liable to fall. Round tops of banks to circular curves, in general, not <br /> less than a 6-foot radius. Rounded surfaces shall be neatly and smoothly trimmed. <br /> Neatly blend all new grading into surrounding, existing terrain, and maintain <br /> Forward Landfill WMU FU-14 <br /> 02300 26 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.