My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
current drainage patterns or modify drainage as shown on the Construction <br /> Drawings. Overexcavating and backfilling to the proper grade will not be <br /> acceptable. Finished site grading will be reviewed by the QA/QC <br /> CONSULTANT. <br /> 3.20 TOLERANCES <br /> A. Construct material limits within tolerance specified in Section 01410, SURVEYS. <br /> 3.21 TOPOGRAPHIC SURVEYS <br /> A. Refer to Section 01410, SURVEYS, for requirements regarding preconstruction <br /> surveys. <br /> B. The OWNER will conduct detailed topographic surveys of site to document "as- <br /> built" prepared subgrade on base and slope, thickness and grade of clay liner <br /> installed, thickness of granular drainage layer installed, thickness of protective <br /> operations layer installed, dimensions of termination berms and sumps, and <br /> terminations of geomembrane liner. All surveys will be performed in accordance <br /> with Section 01410, SURVEYS. <br /> 1. Measure area elevations on minimum 75-foot-grid over entire area and at all <br /> breaks in grade. <br /> 2. Establish reference grid at minimum 75-foot centers for surveying materials <br /> with a thickness requirement. <br /> 3. Measure linear dimensions a minimum of 75-feet on center. <br /> 4. Plot results of topographic surveys to scale of 1 inch equals 50 feet and <br /> provide survey information in electronic format to QA/QC CONSULTANT. <br /> 5. QA/QC CONSULTANT will check the survey. The EARTHWORK <br /> CONTRACTOR shall not construct next layer of the lining system until <br /> survey approval is provided by the QA/QCCONSULTANT. QA/QC <br /> CONSULTANT's review shall be completed within 2 working days <br /> following receipt of the as-built survey information. <br /> 3.22 ACCEPTANCE OF WORK <br /> A. Final acceptance will be based on tests made on completed Work, on samples of <br /> material taken from the completed layers, and the as-built surveys. Testing for <br /> final acceptance will be performed by the QA/QC CONSULTANT in accordance <br /> with the requirements of these Specifications and the CQA Manual. <br /> Forward Landfill WMU FU-14 <br /> 02300 27 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.