Laserfiche WebLink
Protective Operations Layer extending a minimum of 4 feet from the centerline of <br /> the pipe in each direction. <br /> 3.10 HDPE TANKS <br /> A. Care shall be taken during the placement of each tank in order to not damage the <br /> underling geomembrane within each sump. Damage to the geomembrane <br /> incurred during placement of the tanks shall be repaired at the EARTHWORK <br /> CONTRACTOR's sole expense. <br /> B. General earthfill shall be compacted around the HDPE tanks in accordance with <br /> Section 02300, EARTHWORK, and as shown on the Construction Drawings. <br /> Hand held equipment may be necessary to obtain adequate compaction of the <br /> general earthfill around the tank. <br /> PART 4MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT <br /> AND PAYMENT PROCEDURES) <br /> END OF SECTION <br /> Forward Landfill WMU FU-l4 <br /> 02535 5 LEACHATE PIPES <br />