Laserfiche WebLink
specified resin and sheet thickness. <br /> g. Statement certifying that no reclaimed polymer is added to the resin. <br /> h. Statement listing percentages of processing aids, antioxidants, and <br /> other additives other than carbon black added to or in the resin. <br /> B. Extrudate Beads and/or Rod. <br /> 1. Statement of production date or dates. <br /> 2. Laboratory certification stating that the extrudate meets the product <br /> requirements of Part 2. <br /> 3. Certification stating that all extrudate is manufactured by one manufacturer <br /> and resin is supplied from one supplier. <br /> 4. Copy of quality control certificates issued by manufacturer. <br /> 5. Test reports from the manufacturer. <br /> 6. Certification stating that the extrudate bead or rod resin is the same type, <br /> from the same manufacturer and compatible with the resin used to <br /> manufacture the geomembrane supplied for this project. <br /> C. Schedules and Drawings. <br /> 1. Submit installation schedule 2 weeks prior to installation. Include hours to be <br /> worked per day, week and shift. Indicate all weather delay built into <br /> schedule. <br /> 2. Submit installation layout drawings 2 weeks prior to installation of <br /> geomembrane, submit drawings showing the panel layout indicating both <br /> fabricated (if applicable)and field seams, and details not conforming to the <br /> Contract Drawings. Upon acceptance,use these drawings for installation of <br /> geomembrane. <br /> D. Field Quality Control Documents <br /> I. Submit quality control documentation prepared during installation. Submit <br /> no later than 1 week following completion of work. <br /> 2. Submit daily prior to the start of installation,subgrade acceptance certificate <br /> signed by the installation supervisor for each area to be covered by the <br /> geomembrane. Allow QA/QC CONSULTANT time to inspect certified area. <br /> E. Equipment: Submit the following 2 weeks prior to installation: <br /> 1. Equipment list stating quantity, types, model numbers, calibration <br /> certificates, and maintenance requirements. <br /> F. Submit upon completion of the installation: <br /> 1. Certificate stating the liner has been installed in accordance with the plans <br /> and specifications. <br /> 2. The warranty obtained from the manufacturer/fabricator and the installation <br /> warranty. <br /> 3. As-built drawings showing locations of panels,seams,repairs,patches,and <br /> destructive samples, including measurements. <br /> 4. Copies of seam test results. <br /> Forward Landfill WMU FU-14 HIGH DENSITY POLYETHYLENE <br /> 02778 4 (HDPE)GEOMEMBRANE <br />