My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1 Meetings <br />In order to facilitate construction, and to clearly define construction goals and activities, close <br />coordination between the Owner, Design Engineers, QA/QC Consultant, and Contractor is essential. <br />To meet this objective, pre -construction and progress meetings will be held. <br />2.1.1 Pre -Construction Meeting <br />Following bid award, a pre -construction meeting will be held at the site. The purpose of this <br />meeting, attended by the Owner, Contractor, Design Engineer, QA/QC Consultant, and others <br />designated by the Owner, will be to: <br />• Review the construction drawings, specifications, CQA Manual, work area security, <br />health and safety procedures, and related issues. <br />• Provide all parties with relevant project documents. <br />• Review responsibilities and qualifications of each parry. <br />• Define lines of communication and authority. • <br />• Establish reporting and documenting procedures. <br />• Review procedures for handling submittals. <br />• Review testing equipment and procedures. <br />• Review procedures for field directives and change orders. <br />• Establish testing protocols and procedures for correcting and documenting <br />construction or non-conformance. <br />• Establish weekly meeting schedule. <br />• Conduct a site inspection to discuss work areas, stockpile areas, lay down areas, <br />access roads, haul roads, and related items. <br />• Review the project schedule and critical path items. <br />• Contractor's work plan. <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.