My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The meeting will be documented by the Construction Manager. Copies of the minutes and relevant <br />documents will be prepared and provided to all parties. <br />2.1.2 Daily Progress Meeting <br />Informal progress meetings will be held each morning before the start of work. At a minimum, this <br />meeting will be attended by the QA/QC Consultant and Contractor. The purpose of this meeting is <br />to: <br />• Discuss problems and resolutions. <br />• Review test data. <br />• Discuss the Contractor's personnel and equipment assignments for the day. <br />® Review the pervious day's activities and accomplishments. <br />• Resolve any outstanding problems or disputes. <br />2.1.3 Weekly Meeting <br />Weekly scheduled meetings will be held. The Owner, Construction Manager, QA/QC Consultant, <br />® and Contractor will be present. The meetings will be held to discuss progress, problems, <br />construction schedule, changes, test data, safety, environmental issues, and any other issues <br />necessary. The Construction Manager will prepare the agenda for each meeting and prepare meeting <br />minutes for distribution to all parties. <br />2.1.4 Other Meetings <br />As required, special meetings will be held to discuss problems or non-conformance. This meeting <br />will be attended by parties as directed by the Owner. If the problem requires a design modification <br />and subsequent change order, the Design Engineer should also be present. The meeting will be <br />documented as directed by the Construction Manager. <br />2.2 Responsibilities of Parties <br />2.2.1 Responsibilities of the Construction Manager <br />The Construction Manager is responsible for oversight of the Earthwork and Geosynthetics <br />Contractors and assisting with coordination issues between Contractors. The Construction Manager <br />will also monitor the progress of construction in relation to the Contractor's submitted schedule and <br />will review the Contractor's applications for payment. Change Orders will be processed by the <br />Construction Manager. <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.