My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C7 <br />C7 <br />CLAY LINER <br />" <br />N DIAMETER TERMINATIO <br />REMOVE EXISTINGN BERM <br />HDPE TANK - <br />�IBACKFILL WITH - <br />GENERAL <br />V EARTH FILL - <br />SECTION <br />CONNECTION TO TEMPORARY SUMP SHT 3 <br />NTS (SEE NOTE 3.4 <br />REMOVE EXISTING <br />OPERATIONS LAYER <br />– GEOTEXTILE <br />TERMINATION BERM <br />DRAINAGE MATERIAL <br />6" PERFORATED <br />REMOVE EXISTING <br />REMOVE EXISTING <br />TERMINATION BERM <br />PLYWOOD SHEETING AND <br />PROTECTIVE GEOTEXTILE <br />PROTECTIVE <br />- <br />OPERATION LAYER <br />FILTER GEOTEXTILE <br />(SEE NOTE 1) Z <br />2 <br />ro <br />1 <br />NOTES: <br />CUSHION <br />GEOTEXTlLE <br />(SEE NOTE 1) '.'...,_ <br />o <br />i i '•r's'I..r� T ^s,+°: tl yTd_•- - <br />p.o <br />1. <br />OVERLAP EXISTING UNDAMAGED GEOTEXTILE AND WMU FU -14 GEOTEXTILE A MINIMUM OF 2 FEET. <br />2 MIN <br />2. <br />KEY NEW CLAY LINER INTO EXISTING CLAY LINER. <br />GRANULAR <br />3. <br />PUMP LEACHATE OUT OF WMU FU -10 SUMP PRIOR TO REMOVAL <br />DRAINAGE <br />MATERIAL <br />APPROX. 1T <br />4. <br />THE CONTRACTOR SHALL CREATE A TEMPORARY SUMP FOR THE EXISTING LEACHATE COLLECTION <br />CLAY LINER <br />SYSTEM. THE TEMPORARY SUMP SHALL BE USED BETWEEN THE TIME THE EXISTING TANK IS <br />60 -mil TEXTURED <br />NATIVE <br />GROUND <br />REMOVED AND THE CONNECTION TO WMU FU -141S MADE. THE TEMPORARY SUMP MAY BE <br />HDPE GEOMEMBRANE <br />CREATED BY PLACING PIPE UNDER THE EXISTING GEOMEMBRANE ON THE DOWNSTREAM SIDE OF <br />THE EXISTING PIPE TO CREATE A BARRIER ANDIOR CREATING A "POCKET" DOWNSTREAM OF THE <br />I <br />EXISTING PIPE USING HDPE GEOMEMBRANE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />SECTION <br />/^\ <br />CONVEYING THE COLLECTED LEACHATE FROM THE TEMPORARY SUMP TO THE ONSITE LEACHATE <br />V <br />( LJ \ <br />POND. <br />CONNECTION TO EXISTING LINER SYSTEM SHT 3 <br />NTS <br />5. <br />THE CONTRACTOR SHALL CONNECT THE EXISTING NORTH -SOUTH 6" HDPE PIPE FROM WMU FU -13 <br />` _ _ _ _ _ _ _ <br />— <br />\l1 — —U <br />_ _ _ _ _ _ _ <br />-- <br />TO THE NEW WMU FU -14 NORTH -SOUTH 6" HDPE PIPE AT THE EASTERN TERMINATION BERM. THE <br />PIPES SHALL BE JOINED IN ACCORDANCE WITH THE SPECIFICATIONS. <br />F <br />WELD EXISTING <br />eo-rmWMU DOUBLE TEXTURED 3' <br />HDPE GEOMEMBRANE MIN <br />HOPE GEOMEMBRANE <br />/ Mrml DOUBLE TEXTURED ` <br />HDPE GEOMEMBRANE <br />/ <br />r/ l <br />I <br />_ <br />WMU FU -14 <br />EXISTING <br />CLAY LINER MIN <br />CLAY LINER <br />NOTE 2) <br />---------------- <br />(NOTE 2) <br />CLAY LINER <br />" <br />N DIAMETER TERMINATIO <br />REMOVE EXISTINGN BERM <br />HDPE TANK - <br />�IBACKFILL WITH - <br />GENERAL <br />V EARTH FILL - <br />SECTION <br />CONNECTION TO TEMPORARY SUMP SHT 3 <br />NTS (SEE NOTE 3.4 <br />PROTECTIVE <br />OPERATIONS LAYER <br />– GEOTEXTILE <br />GRANULAR <br />DRAINAGE MATERIAL <br />6" PERFORATED <br />REMOVE EXISTING <br />HDPE PIPE, SDR77 <br />TERMINATION BERM <br />CLAY LINER <br />" <br />N DIAMETER TERMINATIO <br />REMOVE EXISTINGN BERM <br />HDPE TANK - <br />�IBACKFILL WITH - <br />GENERAL <br />V EARTH FILL - <br />SECTION <br />CONNECTION TO TEMPORARY SUMP SHT 3 <br />NTS (SEE NOTE 3.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.