Laserfiche WebLink
C7 <br />C7 <br />CLAY LINER <br />" <br />N DIAMETER TERMINATIO <br />REMOVE EXISTINGN BERM <br />HDPE TANK - <br />�IBACKFILL WITH - <br />GENERAL <br />V EARTH FILL - <br />SECTION <br />CONNECTION TO TEMPORARY SUMP SHT 3 <br />NTS (SEE NOTE 3.4 <br />REMOVE EXISTING <br />OPERATIONS LAYER <br />– GEOTEXTILE <br />TERMINATION BERM <br />DRAINAGE MATERIAL <br />6" PERFORATED <br />REMOVE EXISTING <br />REMOVE EXISTING <br />TERMINATION BERM <br />PLYWOOD SHEETING AND <br />PROTECTIVE GEOTEXTILE <br />PROTECTIVE <br />- <br />OPERATION LAYER <br />FILTER GEOTEXTILE <br />(SEE NOTE 1) Z <br />2 <br />ro <br />1 <br />NOTES: <br />CUSHION <br />GEOTEXTlLE <br />(SEE NOTE 1) '.'...,_ <br />o <br />i i '•r's'I..r� T ^s,+°: tl yTd_•- - <br />p.o <br />1. <br />OVERLAP EXISTING UNDAMAGED GEOTEXTILE AND WMU FU -14 GEOTEXTILE A MINIMUM OF 2 FEET. <br />2 MIN <br />2. <br />KEY NEW CLAY LINER INTO EXISTING CLAY LINER. <br />GRANULAR <br />3. <br />PUMP LEACHATE OUT OF WMU FU -10 SUMP PRIOR TO REMOVAL <br />DRAINAGE <br />MATERIAL <br />APPROX. 1T <br />4. <br />THE CONTRACTOR SHALL CREATE A TEMPORARY SUMP FOR THE EXISTING LEACHATE COLLECTION <br />CLAY LINER <br />SYSTEM. THE TEMPORARY SUMP SHALL BE USED BETWEEN THE TIME THE EXISTING TANK IS <br />60 -mil TEXTURED <br />NATIVE <br />GROUND <br />REMOVED AND THE CONNECTION TO WMU FU -141S MADE. THE TEMPORARY SUMP MAY BE <br />HDPE GEOMEMBRANE <br />CREATED BY PLACING PIPE UNDER THE EXISTING GEOMEMBRANE ON THE DOWNSTREAM SIDE OF <br />THE EXISTING PIPE TO CREATE A BARRIER ANDIOR CREATING A "POCKET" DOWNSTREAM OF THE <br />I <br />EXISTING PIPE USING HDPE GEOMEMBRANE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />SECTION <br />/^\ <br />CONVEYING THE COLLECTED LEACHATE FROM THE TEMPORARY SUMP TO THE ONSITE LEACHATE <br />V <br />( LJ \ <br />POND. <br />CONNECTION TO EXISTING LINER SYSTEM SHT 3 <br />NTS <br />5. <br />THE CONTRACTOR SHALL CONNECT THE EXISTING NORTH -SOUTH 6" HDPE PIPE FROM WMU FU -13 <br />` _ _ _ _ _ _ _ <br />— <br />\l1 — —U <br />_ _ _ _ _ _ _ <br />-- <br />TO THE NEW WMU FU -14 NORTH -SOUTH 6" HDPE PIPE AT THE EASTERN TERMINATION BERM. THE <br />PIPES SHALL BE JOINED IN ACCORDANCE WITH THE SPECIFICATIONS. <br />F <br />WELD EXISTING <br />eo-rmWMU DOUBLE TEXTURED 3' <br />HDPE GEOMEMBRANE MIN <br />HOPE GEOMEMBRANE <br />/ Mrml DOUBLE TEXTURED ` <br />HDPE GEOMEMBRANE <br />/ <br />r/ l <br />I <br />_ <br />WMU FU -14 <br />EXISTING <br />CLAY LINER MIN <br />CLAY LINER <br />NOTE 2) <br />---------------- <br />(NOTE 2) <br />CLAY LINER <br />" <br />N DIAMETER TERMINATIO <br />REMOVE EXISTINGN BERM <br />HDPE TANK - <br />�IBACKFILL WITH - <br />GENERAL <br />V EARTH FILL - <br />SECTION <br />CONNECTION TO TEMPORARY SUMP SHT 3 <br />NTS (SEE NOTE 3.4 <br />PROTECTIVE <br />OPERATIONS LAYER <br />– GEOTEXTILE <br />GRANULAR <br />DRAINAGE MATERIAL <br />6" PERFORATED <br />REMOVE EXISTING <br />HDPE PIPE, SDR77 <br />TERMINATION BERM <br />CLAY LINER <br />" <br />N DIAMETER TERMINATIO <br />REMOVE EXISTINGN BERM <br />HDPE TANK - <br />�IBACKFILL WITH - <br />GENERAL <br />V EARTH FILL - <br />SECTION <br />CONNECTION TO TEMPORARY SUMP SHT 3 <br />NTS (SEE NOTE 3.4 <br />