My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLAN DETAIL I X41 <br />LEACHATE COLLECTION TEMPORARY SUMP (TYPICAL) SHT 3 <br />NTS (SEE NOTE 2) <br />NOTE: GENERAL EARTHFILL OVER SUMP AND LINER <br />TERMINATION NOT SHOWN. (SEE SHEET 4) <br />NOTES <br />1. PERFORATION PATTERN: 1/2 INCH DIAMETER HOLES AT PIPE THIRD POINTS. SPACED <br />6 -INCHES ON CENTER. CONTRACTOR TO PLACE CAP OVER UPGRAD04T END OF EACH PIPE. <br />2. SUMP DIMENSIONS ARE MINIMUMS. CONTRACTORS MAY ADJUST TO FACILITATE <br />CONSTRUCTION WITH PRIOR APPROVAL OF ENGINEER. <br />N <br />m <br />U <br />C <br />m <br />w <br />CL <br />m <br />c <br />0 <br />tr <br />CL <br />U <br />ZLO <br />m <br />p <br />p <br />�M <br />Z G W N <br />00 <br />X qU <br />Of <br />M U N <br />Lo cn Z ui <br />O) Q O <br />g <br />J -- <br />a. a <br />rn <br />_Z <br />uv ¢ c v <br />Z v c n <br />z o <br />W� <br />-JO `ups <br />O (� <br />J J <br />p <br />a tJ <br />p <br />� i p <br />3 N <br />D: O <br />O i= <br />U <br />W <br />cn <br />Sheet -7 -of 8 <br />Rev <br />-"-z-� <br />SHT S' <br />TOP OF CLAY <br />EDGE OF CLAY LINER <br />AND GEOMEMBRANE <br />*MIN <br />13:1 4' MIN <br />HDPETANK <br />BASE <br />(STS <br />EL+2.10I <br />/„\ <br />_ 1SHTT <br />S <br />I <br />I <br />I <br />I f 3:1 <br />N MIN <br />V MIN <br />.r GENERAL <br />i EARTHFILL-�� PROTECTIVE <br />6:1 <br />OPERATIONS LAYER <br />re YP <br />2 <br />6" HDPE PERFORATED <br />2% <br />6"HDPE PERFORATED <br />LEACHATE COLLECTION PIPE <br />1� <br />LEACHATE COLLECTION PIPE2% <br />—"' <br />21 <br />(SEE NOTE 1) <br />(SEE NOTE 1) <br />COARSE GRAVEL _ _ r FILTER GEOTEXTILE <br />�-- GRANULAR CUSHION GE0T17CTit£ <br />6:1 <br />f 6:1 <br />FILTER GEOTEXTILE <br />` <br />Z DRAINAGE i% MIN <br />f Typ <br />Typ <br />2 <br />- 2 MATERIAL -� <br />f <br />I <br />. <br />6" HDPE PERFORATEDLEACHATE <br />�.. W MIN <br />3" MIN 1' MIN <br />(SEE NOTE 1;Ot.LECTION PIPE <br />SEE DETAIL <br />SHT <br />8 <br />6 80 -mi! TEXTURED <br />FOR EASTERN EDGE <br />CLAY LINER <br />6" HDPE PIPE HOPE GEOMEMBRANE <br />SDR II -PERFORATED <br />LEACHATE COLLECTION <br />(SEE NOTE 1) <br />TRENCH DETAIL <br />HDPE 45^ CROSS <br />SEE DETAIL <br />SHTS <br />SHT6 FOR LEACHATE <br />� <br />DETAIL l ls 1 <br />COLLECTION <br />TRENCH DETAIL <br />EASTERN EDGE LEACHATE SHT 4,7 <br />COLLECTION TRENCH AND PIPE <br />NTS <br />PLAN DETAIL I X41 <br />LEACHATE COLLECTION TEMPORARY SUMP (TYPICAL) SHT 3 <br />NTS (SEE NOTE 2) <br />NOTE: GENERAL EARTHFILL OVER SUMP AND LINER <br />TERMINATION NOT SHOWN. (SEE SHEET 4) <br />NOTES <br />1. PERFORATION PATTERN: 1/2 INCH DIAMETER HOLES AT PIPE THIRD POINTS. SPACED <br />6 -INCHES ON CENTER. CONTRACTOR TO PLACE CAP OVER UPGRAD04T END OF EACH PIPE. <br />2. SUMP DIMENSIONS ARE MINIMUMS. CONTRACTORS MAY ADJUST TO FACILITATE <br />CONSTRUCTION WITH PRIOR APPROVAL OF ENGINEER. <br />N <br />m <br />U <br />C <br />m <br />w <br />CL <br />m <br />c <br />0 <br />tr <br />CL <br />U <br />ZLO <br />m <br />p <br />p <br />�M <br />Z G W N <br />00 <br />X qU <br />Of <br />M U N <br />Lo cn Z ui <br />O) Q O <br />g <br />J -- <br />a. a <br />rn <br />_Z <br />uv ¢ c v <br />Z v c n <br />z o <br />W� <br />-JO `ups <br />O (� <br />J J <br />p <br />a tJ <br />p <br />� i p <br />3 N <br />D: O <br />O i= <br />U <br />W <br />cn <br />Sheet -7 -of 8 <br />Rev <br />
The URL can be used to link to this page
Your browser does not support the video tag.