My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.3 SUBMITTALS <br /> A. General: The EARTHWORK CONTRACTOR shall ensure that all submittals are <br /> complete and approved in accordance with the requirements and procedures in <br /> this Section and Section 01330. All submittals must include the reference <br /> numbers shown in this Section. <br /> B. Submittals Required After Contract Award and Prior to Construction. <br /> 1. Material Certification (EW1A): Certification, test results, source, and <br /> samples for all EARTHWORK CONTRACTOR supplied imported material <br /> as required by Article 1.4, IMPORTED MATERIAL ACCEPTANCE, of <br /> this Specification Section. <br /> 2. Equipment List (EW 113): Clay Liner Material processing, compaction, and <br /> moisture control equipment, to include the following, as appropriate, for <br /> each equipment type: <br /> a. Catalog and manufacturer data sheets. <br /> b. Equipment operating data from similar projects. <br /> C. The Clay Liner Material processing, compaction, and moisture control <br /> equipment must be approved by the DESIGN ENGINEER prior to use <br /> on the project. However, approval of the equipment by the DESIGN <br /> ENGINEER does not release the EARTHWORK CONTRACTOR <br /> from full compliance with the provisions of this Section. <br /> 1.4 IMPORTED MATERIAL ACCEPTANCE <br /> ® A. All imported materials specified in this specification section are subject to the <br /> following requirements: <br /> 1. All tests necessary for the EARTHWORK CONTRACTOR to locate an <br /> acceptable source of imported material shall be made by the EARTHWORK <br /> CONTRACTOR. Certification that the material conforms to the <br /> Specification requirements along with copies of the control test results from <br /> a qualified commercial testing laboratory shall be submitted to the QA/QC <br /> CONSULTANT for approval at least 10 days before the material is required <br /> for use. All material samples shall be furnished by the EARTHWORK <br /> CONTRACTOR at his sole expense. Samples shall be representative and <br /> be clearly marked to show the source of the material and the intended use on <br /> the project. Sampling of the material source shall be done by the <br /> EARTHWORK CONTRACTOR in accordance with ASTM D75. Notify <br /> the QA/QC CONSULTANT at least 24 hours prior to sampling. The <br /> QA/QC CONSULTANT may observe the sampling procedures. Tentative <br /> acceptance of the material source shall be based on an inspection of the <br /> source by the QA/QC CONSULTANT and/or the certified test results <br /> submitted by the EARTHWORK CONTRACTOR to the QA/QC <br /> CONSULTANT. No imported materials shall be delivered to the site until <br /> the proposed source and material control tests have been tentatively <br /> accepted in writing by the QA/QC CONSULTANT. Final acceptance will <br /> be based on all tests made on samples of material taken from the completed <br /> and compacted course. All acceptance testing for final acceptance shall be <br /> performed by the QA/QC CONSULTANT. <br /> Forward Landfill WMU FU-14 <br /> 02300 2 EARTHWORK <br />