5-6 <br />5.2.4.2 Proposed Final Cover Design <br />Introduction <br />Several factors were taken into consideration in determining the final cover design for the <br />Forward Landfill, including the geometry of the existing landfill, local climatic conditions (i.e., <br />arid environment, low rainfall, and high evaporation rate), potential landfill settlement, <br />available cover materials, erosion protection, vegetative growth, and the proposed end use <br />after closure. Based on these factors, Forward, Inc. determined that an alternative final <br />cover design utilizing an on-site soil engineered as a monolithic final cover design was the <br />most appropriate cover system for the Forward Landfill. Approval of a final cover design that <br />is different than the prescriptive standard is allowed under 27 CCR, Section 20080(b) as an <br />alternative cover system. The alternative design is allowed if the discharger demonstrates <br />that: <br />(1) The construction of prescriptive standard is not feasible as provided in subsection (c) <br />of Section 20080, and <br />(2) There is a specific engineered alternative that: <br />(A) is consistent with the performance goal addressed by the particular <br />construction or prescriptive standard, and <br />(B) affords equivalent protection against water quality impairment. <br />As stipulated in subsection (c) of Section 20080, to establish that the prescriptive standard <br />is not feasible the discharger must demonstrate that the prescriptive standard: <br />(1) is unreasonably and unnecessarily burdensome and will cost substantially more than <br />alternatives which meet the criteria in subsection (b) of Section 20080; or <br />(2) is impractical and will not promote attainment of applicable performance standards. <br />The proposed alternative final cover design will meet or exceed the prescribed performance <br />criteria and will be more economical for site closure than prescriptive standards. <br />Alternatives to the prescriptive standards are allowed pursuant to 27 CCR, Section 21090 <br />which states that "The RWQCB can allow any alternative final cover design that it finds will <br />continue to isolate the waste in the Unit from precipitation and irrigation waters at least as <br />well as would a final cover built in accordance with applicable prescriptive standards". <br />In 2005, GLA prepared a report in support of the alternative final cover design (see Appendix <br />1). The report evaluated the performance of the alternative final cover for the Forward <br />Landfill. The analysis preformed in support of the alternative final cover was done using <br />Forward Landfill SWT Engineering <br />Joint Technical Document - April 2014 <br />z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\text\sec 5 final.doc <br />