My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_8
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:38:44 PM
Creation date
7/3/2020 10:58:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2014-0006 -17- <br /> FORWARD INC.AND REPUBLIC SERVICES INC, <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 67.On 30 May 2002, the Discharger submitted a Joint Technical Document requesting approval <br /> of single composite bottom liner that complies with the prescriptive standard liner <br /> requirements and an engineered alternative to the prescriptive standard for the side slope <br /> liner requirements for all future modules at the facility. Future landfill modules shall have a <br /> single composite bottom liner that consists of, in ascending order: a prepared subgrade; a <br /> 24-inch thick, low-permeability soil layer (minimum permeability of 1 X 10-7 cm/sec); a 60-mil <br /> high density polyethylene (HDPE) geomembrane; a 12-ounce/square yard cushion geotextile <br /> (may be omitted if the LCRS gravel is sub-angular to rounded); a 12-inch LCRS gravel <br /> drainage layer; an 8-ounce/square yard separator geotextile; and a 12-inch thick protective <br /> cover soil operations layer. The components for the engineered alternative side slope liner <br /> of the future landfill modules consists of, in ascending order.. a prepared subgrade; a <br /> Geosynethic Clay Liner (GCL) or a 24-inch thick low permeability soil layer (minimum <br /> permeability of the soil 1 X 10-7 cm/sec); a 60-mil HDPE geomembrane; a geocomposite <br /> drainage net; and a 12-inch thick protective cover soil operations layer. <br /> 68.The Discharger's engineered alternative demonstration contends that installation of 24- <br /> inches of compacted low permeability soil and gravel drainage material on side slopes will be <br /> technically difficult and would cost substantially more than the use of GCL and geocomposite <br /> drainage net respectively (the alternative design). <br /> 69.The Discharger adequately demonstrated that construction of a Subtitle D prescriptive <br /> standard liner would be unreasonably and unnecessarily burdensome when compared to the <br /> proposed engineered alternative design. The Discharger demonstrated that the proposed <br /> engineered alternative is consistent with the performance goals of the prescriptive standard <br /> and affords at least equivalent protection against water quality impairment. <br /> 70.The approved leachate collection and removal system (LCRS) consists of a 12-inch gravel <br /> layer with six-inch high density polyethylene (HDPE) lateral pipe and headers. The drainage <br /> layer has a minimum 2% grade towards the leachate collection pipes and minimum 1% grade <br /> along the leachate collection pipes. The leachate collection pipes are placed on <br /> approximately 200-foot centers. Calculated peak daily leachate generation is 4,073 <br /> gallons/acre or approximately 0.0045 cubic feet per second. Daily peak head on the liner <br /> system is calculated to be approximately 1.6 inches. Collected leachate is either recirculated <br /> to composite-lined landfill units or discharged to one of the onsite Class II impoundments. <br /> Recirculated leachate may be discharged by spraying from a tanker truck or by subsurface <br /> injection. <br /> 71 .A pan lysimeters will be installed beneath the LCRS sump in each new landfill cell/module for <br /> the purpose of vadose zone monitoring. The proposed design for the pan lysimeters <br /> consists of, in ascending order: a prepared subgrade; a 24-inch thick, low-permeability soil <br /> layer (minimum permeability of 1 X 10-7 cm/sec) or a GCL liner; a 60-mil HDPE <br /> geomembrane; and a gravel filled pan lysimeter with access pipe. Overlying the pan <br /> lysimeter is the primary sump which consists of a GCL liner; a 60-mil HDPE geomembrane; a <br /> Is gravel filled LCRS sump with access pipe; an 8-ounce/square yard separator geotextile; and <br /> a 12-inch thick protective cover soil operations layer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.