Laserfiche WebLink
Project Name 6 (LWT <br />Inspector's Name-VN1i,, KISNNAW <br />Unit Tested W M U — W k'� <br />Date .- 8-2-14C <br />(C) TRACER DYE DETECTION MONITORING LOG <br />Pump start time: 101b 6" SI8 Approximate pump flow rater r►a <br />Does the pump reading indicate continuous flow? Yes-X—No <br />Time Flow Rate (gpm) Tracer Dye Detected (YIN) <br />r one kn — N <br />10 ZI <br />10 Wo " 4, <br />Was tracer dye detected from the LCRS sump?Yes No <br />If Yes, state approximate migration time to deter n <br />If No, state possible reason NIAr <br />Remedial Action Work Order Date Completed Signature <br />Signature of Inspector <br />_ Ay� <br />Page 2 of 2 <br />i <br />