Laserfiche WebLink
FAWt K11 <br />(A) TRACER DYE PRE -TESTING PHASE <br />1. Is the LCRS sump pumped for liquids prior to testing? yes_X_ <br />2. Was a pre -testing LCRS sample collected for observation? yes_X <br />3. If the sump was not pumped prior to testing, state reason: NA <br />,,:VALUE • <br />no <br />no <br />4. Is the entry port free and clear of accumulated debris? yeses_ no <br />5. Are any repairs needed to the port prior to LCRS continuity testing? yes no <br />6. Total number of ports that require repair: --7V-' <br />7. If repairs are required to the entry port, complete a Maintenance Work Order (MWO). <br />comments:_ lVo AJ� A/,QP&*1 <br />I <br />(B) TRACER DYE INJECTION PHASE <br />Tracer Dye Used: 9LUE VP4L TMCM b4 t~ Unit: WMU_WC_ST <br />9-1-14Start time of tracer dye injection: 10 01 —Tank Start Reading (gat.): 2-o o - 0 <br />Stop time of tracer dye injection: 10 3 (1 Tank Stop Reading (gal.): 0'0 <br />Total volume of tracer dye mixed (ml) : Bo rA L <br />Total volume of tracer dye solution injected in the unit (gallons): 2-00.0 <br />Average flow rate of injected tracer dye solution (gallons per min.): 6 - q <br />Comments: TA_ <br />OY'A vt. <br />EM <br />Signature of Inspector <br />Page 1 of 2 <br />E <br />0 <br />