Laserfiche WebLink
Project Name F-0 P- ft-) J=&I)p LL 4VALUE <br /> Inspector's Name SvoiL_ Y_1SH0/'qJ1 ENGINEERING <br /> Unit Tested W KU_WeST <br /> Date 8-11-1-+ a <br /> ANNUAL LCRS CONTINUITY TEST INSPECTION <br /> (A)TRACER DYE PRE-TESTING PHASE <br /> 1. Is the LCRS sump pumped for liquids prior to testing? yes_><, no <br /> 2. Was a pre-testing LCRS sample collected for observation? yes _ no <br /> 3. If the sump was not pumped prior to testing,state reason: NA <br /> 4. Is the entry port free and clear of accumulated debris? ycs_X,_ no <br /> 5. Are any repairs needed to the port prior to LCRS continuity testing?yes no <br /> 6. Total number of ports that require repair: <br /> 7. If repairs are required to the entry port, complete a Maintenance Work Order(MWO). <br /> Comments:— ND &tPo4o Net" , <br /> I <br /> (B)TRACER DYE INJECTION PHASE <br /> Tracer Dye Used: &w C- \JAJ L TP&Cf, t)_t E Unit: WKO-WuT <br /> ItStart time of tracer dye injection: 0 15-5- Tank Start Reading(gal.): Q-00-Tb <br /> top time of tracer dye injection: I c' ')-� Tank Stop Reading(gal.): C)- 0-b <br /> Total volume of tracer dye mixed(ml) : ao <br /> Total volume of tracer dye solution injected in the unit(gallons):. 2-o cD <br /> Average flow rate of injected tracer dye solution(gallons per min.): 6,2-5- <br /> Comments: A +nuk P_V� <br /> _3'el <br /> U <br /> Remedial Action Work Order Date Completed Signature <br /> Signature of Inspector <br /> Page 1 of 2 <br />