Laserfiche WebLink
Project Name ! N LL <br /> Inspector's Name SUML KISttN l dVALUE <br /> 18 ENGINEERING <br /> Unit Tested UJ M 0`�1�=ST <br /> Date <br /> ANNUAL LCRS CONTINUITY TEST INSPECTION <br /> (C)TRACER DYE DETECTION MONITORING LOG <br /> Pump start time: /t b 5 rn 8-11-(-4 Approximate pump flow rate: v Loq pill <br /> Does the pump reading indicate continuous flow? Yes No <br /> Time Flow Rate fgpm) Tracer Dye Detected(YM <br /> /A—fo —1 Q y _ <br /> Ita -f <br /> {� ti4 � y <br /> v <br /> o } <br /> Was tracer dye detected from the LCRS sump? Yes—XNo <br /> If Yes, state approximate migration time to detection <br /> If No,state possible reason <br /> Remedial Action Work Order Date Completed Signature <br /> I <br /> Signature of Inspector �-----'"� <br /> Page 2 of 2 <br />