Laserfiche WebLink
Geo-LoqkA S S O C I A T E S <br /> Geologists,Hydrogeologists and Engineers • <br /> January 15, 2018 <br /> JN: SO17.1030 <br /> Mr. Brendan Kenny <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive, Suite 200 <br /> Rancho Cordova, CA 95670-6114 <br /> QUARTERLY CORRECTIVE ACTION PROGRESS REPORT <br /> FOURTH QUARTER 2017 <br /> AUSTIN ROAD UNIT, FORWARD LANDFILL <br /> SAN JOAQUIN, CALIFORNIA <br /> Dear Mr. Kenny: <br /> On behalf of Forward, Inc. and in accordance with the April 10, 2017 Cleanup and Abatement Order <br /> (CAO) 115-2017-0703 issued by the Central Valley Regional Water Quality Control Board (CVRWQCB), <br /> Geo-Logic Associates (GLA) is submitting this Quarterly Corrective Action Progress Report (Progress <br /> Report) for the Austin Road Unit (ARU) of the Forward Landfill. This Quarterly Progress Report has <br /> been prepared to provide the information specified in Task 9.a of the CAO. <br /> The information summarized in this Quarterly Progress Report has been compiled from a number of • <br /> sources, including Forward, Inc. personnel, consultants responsible for the operation and <br /> maintenance (O&M) of the Unit's groundwater extraction and treatment system, and consultants <br /> responsible for the 0&M of the facility's landfill gas extraction and destruction system. <br /> All Work Completed During Previous Calendar Quarter to Comply with CAO <br /> During the period of October 1 through December 31, 2017,the following work was completed to <br /> comply with the CAO and other corrective action requirements: <br /> ➢ The Quarterly Progress Report for the third quarter 2017 was submitted to the <br /> CVRWQCB on October 13, 2017, in accordance with Task 9.a.of CAO 115-2017-0703. <br /> ➢ The Domestic Well Sampling Program Reports were submitted to the CVRWQCB on <br /> December 21, 2017, in accordance with Task 1.b of CAO R5-2017-0703. <br /> ➢ Construction of groundwater monitoring wells described in the Groundwater Plume <br /> Definition—West of the Landfill Workplan Task 3.a of CAO 115-2017-0703 was started <br /> on August 21, 2017. <br /> ➢ The Point of Compliance Monitoring Network Installation Report was submitted to the <br /> CVRWQCB on November 29, 2017, in accordance with Task 2.d of CAO R5-2017-0703. <br /> • <br /> 11415 W.Bernardo Court,Suite 200,San Diego,California• T 858.451.1136 • F 858.451.1087 • www.geo-logic.com <br />