My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:46 PM
Creation date
7/3/2020 10:59:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2017
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-LoqkA S S O C I A T E S <br /> Geologists,Hydrogeologists and Engineers • <br /> January 15, 2018 <br /> JN: SO17.1030 <br /> Mr. Brendan Kenny <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive, Suite 200 <br /> Rancho Cordova, CA 95670-6114 <br /> QUARTERLY CORRECTIVE ACTION PROGRESS REPORT <br /> FOURTH QUARTER 2017 <br /> AUSTIN ROAD UNIT, FORWARD LANDFILL <br /> SAN JOAQUIN, CALIFORNIA <br /> Dear Mr. Kenny: <br /> On behalf of Forward, Inc. and in accordance with the April 10, 2017 Cleanup and Abatement Order <br /> (CAO) 115-2017-0703 issued by the Central Valley Regional Water Quality Control Board (CVRWQCB), <br /> Geo-Logic Associates (GLA) is submitting this Quarterly Corrective Action Progress Report (Progress <br /> Report) for the Austin Road Unit (ARU) of the Forward Landfill. This Quarterly Progress Report has <br /> been prepared to provide the information specified in Task 9.a of the CAO. <br /> The information summarized in this Quarterly Progress Report has been compiled from a number of • <br /> sources, including Forward, Inc. personnel, consultants responsible for the operation and <br /> maintenance (O&M) of the Unit's groundwater extraction and treatment system, and consultants <br /> responsible for the 0&M of the facility's landfill gas extraction and destruction system. <br /> All Work Completed During Previous Calendar Quarter to Comply with CAO <br /> During the period of October 1 through December 31, 2017,the following work was completed to <br /> comply with the CAO and other corrective action requirements: <br /> ➢ The Quarterly Progress Report for the third quarter 2017 was submitted to the <br /> CVRWQCB on October 13, 2017, in accordance with Task 9.a.of CAO 115-2017-0703. <br /> ➢ The Domestic Well Sampling Program Reports were submitted to the CVRWQCB on <br /> December 21, 2017, in accordance with Task 1.b of CAO R5-2017-0703. <br /> ➢ Construction of groundwater monitoring wells described in the Groundwater Plume <br /> Definition—West of the Landfill Workplan Task 3.a of CAO 115-2017-0703 was started <br /> on August 21, 2017. <br /> ➢ The Point of Compliance Monitoring Network Installation Report was submitted to the <br /> CVRWQCB on November 29, 2017, in accordance with Task 2.d of CAO R5-2017-0703. <br /> • <br /> 11415 W.Bernardo Court,Suite 200,San Diego,California• T 858.451.1136 • F 858.451.1087 • www.geo-logic.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.