My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:46 PM
Creation date
7/3/2020 10:59:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2017
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board <br /> January 15,2018 cornerstone <br /> • A TETRA TECH COMPANY <br /> Page 2 <br /> Operations and Maintenance of GCCS <br /> SCS Engineers (SCS) is contracted by Forward to conduct the Operation and Maintenance <br /> (O&M) of the GCCS system at the Landfill. During the fourth quarter of 2017, the following <br /> O&M activities were conducted: <br /> • Quarterly monitoring of LFG probes was conducted; <br /> • Ongoing wellfield monitoring and tuning of the GCCS was performed; <br /> • Inspection of all condensate sumps and pumps for operations was conducted. <br /> Any required maintenance as a result of the inspections was performed; <br /> • There were no known GCCS system failures during the fourth quarter of 2017. <br /> The total hours of operation of the GCCS were 24 hours per day; and <br /> • The instantaneous total flow rate of LFG during December 22,2017 readings was <br /> 1,464 standard cubic feet per minute (scfm) at the LFG to energy (LFGTE)facility <br /> and 2,643 scfm at the flare station. <br /> Order Violations <br /> • To the best of our knowledge,there were no violations of the Order during the fourth <br /> quarter of 2017 as it applies to the operation or maintenance of the GCCS at the Landfill. <br /> Please feel free to contact me at 630-410-7212 or Jessica.bernardini®cornerstoneeg.com if <br /> you have any questions regarding this report. <br /> Sincerely, <br /> Cornerstone Environmental Group,a Tetra Tech Company <br /> Gavin Casson,E.I.T. Jessica Bernardini,P.E. <br /> Project Manager Sr. Project Manager <br /> Enclosure: <br /> Appendix A-SCS Database Tables <br /> Table 1 -Point of Compliance Probe Monitoring Data-Fourth Quarter 2017 <br /> cc: Joseph Lipka,Forward,Inc. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.