Laserfiche WebLink
v <br />n <br />Water Quality Monitoring Report <br />Forward Landfill <br />Monitoring points at the Austin Unit have been constructed to monitor the <br />groundwater/surface water at the facility as follows: <br />AUSTIN UNIT GROUNDWATER MONITORING NETWORK <br />MONITORING POINT <br />MONITORING POINT I.D. <br />Groundwater Monitoring <br />Well - Background <br />AMW-2 <br />DMP Wells <br />AMW-5R, AMW-6, AMW-7, AMW-12 <br />AMW-1, AMW-4, AMW-10, AMW-11, AMW-13, AMW-14, AMW-18, <br />CAP/EMP Wells (Shallow) <br />AMW-19, AMW-21S, AMW-22S, AMW-24SR, AMW-29S, AMW-30S, <br />AMW-31S, AMW-32S <br />AMW-13B, AMW-18B, AMW-19BR AMW-21, AMW-22, AMW-24R, <br />CAP/EMP Wells (Deep) <br />AMW-25, AMW-26R, AMW-28, AMW-29, AMW-30, AMW-31, <br />AMW-32 <br />Domestic Wells <br />7898-A, 8106-A <br />Surface Water Stations <br />ASW -1, ASW -2 <br />Lysimeters <br />FU -03, FU -04W, FU -04E, FU -05, FU -06, LY -POND -N, LY -POND -S <br />1.2 Compliance Record <br />With the exception of Waste Management Unit (WMU) A, the Forward Landfill has been <br />operated as a Class II and Class III landfill since it opened in 1973. However, from 1979 to 1984, <br />industrial wastes, consisting primarily of strontium and barium sludge, were accepted at the <br />landfill and placed in WMU A. In 1984, the DISC determined that WMU A should be closed as a <br />Class I hazardous waste management unit. Final closure was completed in 1989 (Kleinfelder <br />1999). <br />A hazardous waste facility post -closure permit ("the initial post -closure permit") was issued for <br />the Site on January 2, 1990. On February 25, 1994, Forward Landfill requested that the DTSC <br />modify the initial post -closure permit to reduce the number of sampling events from eight per <br />year (two quarterly) to four per year. DTSC approved this request ("Modification No. 1") in a <br />letter dated March 2, 1994 (Kleinfelder 1999). <br />On November 4, 1994, a revised post -closure maintenance plan (RPCMP) was submitted to the <br />DTSC. The DTSC approved the RPCMP and issued Permit Modification No. 2. This modification <br />superceded all of the requirements of the initial post -closure permit and Modification No. 1. <br />The DTSC issued a revised Postclosure Permit on June 30, 2003. Forward Landfill implemented <br />the Corrective Action Program for the site, which was based on a two-year proof period that <br />began on June 7, 1995. <br />Project No. 2016.0007 1 Water Quality Monitoring Report 2 <br />January 2017 <br />