Water Quality Monitoring Report
<br /> Forward Landfill
<br /> Monitoring points at the Austin Unit have been constructed to monitor the
<br /> groundwater/surface water at the facility as follows:
<br /> AUSTIN UNIT GROUNDWATER MONITORING NETWORK
<br /> MONITORING POINT MONITORING POINT I.D.
<br /> Groundwater Monitoring
<br /> AMW 2
<br /> Well-Background
<br /> DMP Wells AMW-5R,AMW-6,AMW-7,AMW-12
<br /> AMW-1,AMW-4,AMW-10,AMW-11,AMW-13,AMW-14,AMW-18,
<br /> CAP/EMP Wells(Shallow) AMW-19,AMW-21S,AMW-22S,AMW-24SR,AMW-29S,AMW-30S,
<br /> AMW-31S,AMW-32S
<br /> AMW-13B,AMW-18B,AMW-19BR AMW-21,AMW-22,AMW-24R,
<br /> CAP/EMP Wells(Deep) AMW-25,AMW-26R,AMW-28,AMW-29,AMW-30,AMW-31,
<br /> AMW-32
<br /> Domestic Wells 7898-A,8106-A
<br /> Surface Water Stations ASW-1,ASW-2
<br /> FU-03,FU-04W-A/B,FU-04E-A/B,FU-05-A/B,FU-06-A/B, LY-POND-N,
<br /> Lysimet ers
<br /> LY-PON D-S
<br /> 1.2 Compliance Record
<br /> With the exception of Waste Management Unit (WMU) A, the Forward Landfill has been
<br /> operated as a Class II and Class III landfill since it opened in 1973. However, from 1979 to 1984,
<br /> industrial wastes, consisting primarily of strontium and barium sludge, were accepted at the
<br /> landfill and placed in WMU A. In 1984, the DTSC determined that WMU A should be closed as a
<br /> Class I hazardous waste management unit. Final closure was completed in 1989 (Kleinfelder
<br /> 1999).
<br /> A hazardous waste facility post-closure permit ("the initial post-closure permit") was issued for
<br /> the Site on January 2, 1990. On February 25, 1994, Forward Landfill requested that the DTSC
<br /> modify the initial post-closure permit to reduce the number of sampling events from eight per
<br /> year (two quarterly) to four per year. DTSC approved this request ("Modification No. 1") in a
<br /> letter dated March 2, 1994 (Kleinfelder 1999).
<br /> On November 4, 1994, a revised post-closure maintenance plan (RPCMP) was submitted to the
<br /> DISC. The DTSC approved the RPCMP and issued Permit Modification No. 2. This modification
<br /> superceded all of the requirements of the initial post-closure permit and Modification No. 1.
<br /> The DTSC issued a revised Postclosure Permit on June 30, 2003. Forward Landfill implemented
<br /> the Corrective Action Program for the site, which was based on a two-year proof period that
<br /> began on June 7, 1995.
<br /> Project No.SO17.1030 i water Quality Monitoring Report 2