Laserfiche WebLink
would rise by only 66%, the cost increase is overly <br />conservative. However, if it occurred, Alternatives C.1 and <br />C.2 would be more costly than all other alternatives, as shown <br />in Table 6. <br />Table 6. SENSITIVITY ANALYSIS - DISPOSAL COSTS <br />A. <br />USE PROPOSED NEW HARNEY LANE LANDFILL <br />Total <br />costs if: <br />Haul directly or transfer at existing 2,977 <br />3,173 2,977 2,977 2,977 <br />Development <br />California Waste Removal Systems <br />Development and <br />Central <br />facility in Lodi (proposed project) <br />and <br />2. <br />operating <br />county <br />operating <br />Foothill <br />cost of <br />landfill <br />Total <br />cost of new <br />Landfill <br />central <br />cost is <br />cost <br />Harney Lane <br />cost is <br />county <br />based <br />from <br />Landfill <br />based on <br />landfill <br />on $1.1�/ <br />Table 4 <br />increases a <br />$1/cu yd b <br />increases c <br />cu yd <br />A. <br />USE PROPOSED NEW HARNEY LANE LANDFILL <br />1. <br />Haul directly or transfer at existing 2,977 <br />3,173 2,977 2,977 2,977 <br />California Waste Removal Systems <br />facility in Lodi (proposed project) <br />2. <br />In addition to A.1, transfer at new 3,078 <br />3,274 3,078 3,078 3,078 <br />site midway between Lodi and Stockton <br />(for planning purposes, located at <br />Eight Mile Road and Highway 99) <br />C. <br />USE EXISTING FOOTHILL LANDFILL <br />1. <br />Haul directly or transfer at existing 2,863 <br />2,863 3,114 2,863 2,863 <br />California Waste Removal Systems <br />facility in Lodi <br />2. <br />In addition to C.1, transfer at new 2,881 <br />2,881 3,132 2,881 2,881 <br />site midway between Lodi and Stockton <br />(for planning purposes, located at <br />Eight Mile Road and Highway 99) <br />D. <br />USE PROPOSED CENTRAL CXNTY LANDFILL <br />(for planning purposes, located on <br />Austin Road, 2 miles south of Arch <br />Road in Stockton) <br />1. <br />Haul directly or transfer at existing 2,743 <br />2,743 2,743 2,986 2,938 <br />California Waste Removal Systems <br />facility in Lodi <br />2. <br />in addition to D.1, transfer at new 2,919 <br />2,919 2,919 3,162 3,114 <br />site midway between Lodi and Stockton <br />(for planning purposes, located at <br />Eight Mile Road and Highway 99) <br />a. <br />Land acquisition and site development oosts increase by 508; derating cost increases by 258. <br />b. <br />Essentially the same cost basis as in the 1979 SWMP. <br />C. <br />Land acquisition and site development costs le; <br />derating cost increases by one-third. <br />W <br />