would rise by only 66%, the cost increase is overly
<br />conservative. However, if it occurred, Alternatives C.1 and
<br />C.2 would be more costly than all other alternatives, as shown
<br />in Table 6.
<br />Table 6. SENSITIVITY ANALYSIS - DISPOSAL COSTS
<br />A.
<br />USE PROPOSED NEW HARNEY LANE LANDFILL
<br />Total
<br />costs if:
<br />Haul directly or transfer at existing 2,977
<br />3,173 2,977 2,977 2,977
<br />Development
<br />California Waste Removal Systems
<br />Development and
<br />Central
<br />facility in Lodi (proposed project)
<br />and
<br />2.
<br />operating
<br />county
<br />operating
<br />Foothill
<br />cost of
<br />landfill
<br />Total
<br />cost of new
<br />Landfill
<br />central
<br />cost is
<br />cost
<br />Harney Lane
<br />cost is
<br />county
<br />based
<br />from
<br />Landfill
<br />based on
<br />landfill
<br />on $1.1�/
<br />Table 4
<br />increases a
<br />$1/cu yd b
<br />increases c
<br />cu yd
<br />A.
<br />USE PROPOSED NEW HARNEY LANE LANDFILL
<br />1.
<br />Haul directly or transfer at existing 2,977
<br />3,173 2,977 2,977 2,977
<br />California Waste Removal Systems
<br />facility in Lodi (proposed project)
<br />2.
<br />In addition to A.1, transfer at new 3,078
<br />3,274 3,078 3,078 3,078
<br />site midway between Lodi and Stockton
<br />(for planning purposes, located at
<br />Eight Mile Road and Highway 99)
<br />C.
<br />USE EXISTING FOOTHILL LANDFILL
<br />1.
<br />Haul directly or transfer at existing 2,863
<br />2,863 3,114 2,863 2,863
<br />California Waste Removal Systems
<br />facility in Lodi
<br />2.
<br />In addition to C.1, transfer at new 2,881
<br />2,881 3,132 2,881 2,881
<br />site midway between Lodi and Stockton
<br />(for planning purposes, located at
<br />Eight Mile Road and Highway 99)
<br />D.
<br />USE PROPOSED CENTRAL CXNTY LANDFILL
<br />(for planning purposes, located on
<br />Austin Road, 2 miles south of Arch
<br />Road in Stockton)
<br />1.
<br />Haul directly or transfer at existing 2,743
<br />2,743 2,743 2,986 2,938
<br />California Waste Removal Systems
<br />facility in Lodi
<br />2.
<br />in addition to D.1, transfer at new 2,919
<br />2,919 2,919 3,162 3,114
<br />site midway between Lodi and Stockton
<br />(for planning purposes, located at
<br />Eight Mile Road and Highway 99)
<br />a.
<br />Land acquisition and site development oosts increase by 508; derating cost increases by 258.
<br />b.
<br />Essentially the same cost basis as in the 1979 SWMP.
<br />C.
<br />Land acquisition and site development costs le;
<br />derating cost increases by one-third.
<br />W
<br />
|