Laserfiche WebLink
-2- <br /> 6. Local current and future resource recovery programs need <br /> identification and development as outlined in the Guidelines. <br /> 7. All ordinances and standards necessary for implementation <br /> of the plan should be identified and discussed. <br /> 8. The economic feasibility of the plan needs to be demonstrated.. <br /> 9. The Guidelines require the participation of the public and the <br /> private entrepreneurs in the solid waste management field during <br /> the preparation of the plan. This participation should be dis- <br /> cussed fully or if such involvement was minimal, steps should <br /> be taken to achieve this participation. <br /> 10. Discussion of the compatibility of the plan with the county <br /> general plan should be included along with the recognition of <br /> its agreement with the "Comprehensive Water Quality Control 1 <br /> Plan" and the "State Implementation Plan for Achieving and <br /> Maintaining the National Ambient Air Quality Standards". <br /> As you know, we have arranged for a meeting between you and members of my staff <br /> to discuss these comments on March 13, at 10:00 AM in your office. <br /> i • <br /> Sincerely, <br /> r , <br /> Lawrence A. Burch <br /> Supervising Engineer <br /> Enclosure <br /> c <br /> RECYCLED PAPER <br />