My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1981
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 2:16:11 PM
Creation date
7/3/2020 11:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1981
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_1981.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Analysis sis of Private vs Public Operations (Cont <br /> ) <br /> Equip. Maint . (Con't ) <br /> 2. Self-loading Scraper (After Warranty) <br /> 30 Days at 8 hrs. at $7 . 20 per hr. $1,728 <br /> Utilities - (Sanitary, Telephone , Electricity) 75 <br /> Seryices by Highway Department 500 <br /> (Vacation Relief, Sick Leave Relief, <br /> Moving Equipment ) <br /> Site Maintenance (Road , Weed Killing 600 <br /> and Dust Control ) <br /> $ 4 ,631 <br /> Monthly Cost $ 11,136 <br /> Yearly Cost x 12 <br /> No Capital Costs Included $133 ,632 <br /> The program is based on minimal staffing and does not <br /> contain provisions for vacations , sick leave, etc . This will be <br /> taken care of by personnel from the Highway Division of Public <br /> Works . This condition would be effectively mitigated on the <br /> operations of multiple sites . Relief manpower and standby <br /> equipment would be effectively utilized to cover all eventualities . <br /> It should be noted that the $133 ,632 annual cost of operating <br /> a single site compares fairly well with the City of Lodi ' s cost <br /> for fiscal year 1971-72 of $96,284 , taking into consideration <br /> additional work of weighing and o erations/controls and site <br /> g g p <br /> maintenance . (Figure IX) . The cost of work includes excavation <br /> of trenches and compares fairly close to the City of Lodi' s <br /> contract rental of $34 ,140 . <br /> - 24 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.