My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1981
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 2:16:11 PM
Creation date
7/3/2020 11:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1981
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_1981.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> Cost Analysis of Private vs Public Operations (Con't ) <br /> Item "b . " - <br /> The County would undoubtedly review and evaluate the advan- <br /> tages or disadvantages of a ten-year agreement with the Corporation. <br /> Item 10c . 1' - <br /> The proposal of a fee for the users of the disposal <br /> sites is used by man private operators and public entities . The <br /> Y <br /> success of such an arrangement is dependent on the operational <br /> policies of the cities and counties with respect to free dumping <br /> or fee . The entire proposal undoubtedly is based on an expected <br /> return with a defined minimum tonnage. Whether the tonnage <br /> would be within the minimum range with the Countywide plan in <br /> operation would need to be assessed. The County would need a <br /> positive guarantee for continued operation and site life expectancy <br /> as procedures for acquisition of a new site would require a minimum <br /> of two years. The basic requirements for successful operations as <br /> proposed are : <br /> (1) Economics as to minimum volumes sufficient to <br /> maintain a profitable venture for the contractor--such <br /> minimum volumes are an indefinite quantity. <br /> .(2) Method of operation to assure a minimum of an <br /> additional 10-year life . <br /> Item f'd. " - <br /> This item is again a matter for the City of Lodi to <br /> decide. If the revenues presently derived from the franchise <br /> collector are presently used to defray cost of collection and <br /> billing, the City of Lodi may be amenable to the proposal. <br /> 27 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.