My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 11:01:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for the current fill module. <br /> The vehicle wash down area is located outside on the south side of the <br /> maintenance building. The truck wash water drains toward the sump (a holding <br /> tank) which is equipped with a grease trap. The grease trap is cleaned, and <br /> the wash water is pumped out and used for the landfill watering when the sump <br /> is 3/4 full. <br /> The landfill module areas have a separate storm drainage system. For the fill <br /> module, all four of its sides slopes drain toward a fill module drainage <br /> basin. The drainage basin collects the runoff from the fill site. <br /> An underground storm drain system, trenches, and channels is used to control <br /> storm water from the recycling center and maintenance building. (See figure <br /> B) . The runoffs from the buildings are channeled or pumped to one of the three <br /> site drainage basins which are designed for 100-year storm. <br /> 2.2 LOADING/UNLOADING AREAS <br /> The majority of loading and unloading refuse activities take place in the <br /> recycling center. The center separates biodegradable from the non- <br /> biodegradable wastes. The collected biodegradable waste are taken to the fill <br /> site, and the non-biodegradable waste are collected for recycling to the <br /> extent possible. <br /> Both outside and inside areas of the recycling center are washed down <br /> regularly for dust control. To control the wash water runoff, the grounds are <br /> sloped toward sumps which are located on the north and south sides of the <br /> center. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.