Laserfiche WebLink
r <br /> 2_3 CONTROL MEASURES TO REDUCE POLLUTANTS IN STORM WATER DISCHARGE <br /> 2.3.1 STRUCTURAL CONTROLS <br /> The construction design for current fill area at North county Recycling <br /> Center and Sanitary Landfill is protected by the High Density <br /> Polyethylene (HDPE) below ground liner to ensure containment of <br /> discharged wastes over the operating life. Storm drainage retention <br /> i <br /> ponds collect runoff from the rest of the activity areas. <br /> 2.3.2 NON STRUCTURAL CONTROLS <br /> t ' <br /> The non structural source controls utilized at the North County <br /> Recycling Center and Sanitary Landfill to protect storm water quality <br /> consists of procedures and policies designed to ensure that equipment <br /> and personnel operate in a manner that minimizes the sources of <br /> `' potential storm water pollutants. Standard Operations Practices for the <br /> North County Recycling Center and Sanitary Landfill are described in the <br /> landfill's RDSI. A copy of the Report Disposal Site Information (RDSI) <br /> can be obtained from County Solid Waste Division (209) 468- 3066. <br /> 2.4 INDUSTRIAL STORM WATER DISCHARGE TREATMENT FACILITIES <br /> North County Recycling Center and Sanitary Landfill has no storm water <br /> discharge treatment facilities. <br /> 2.5 SAMPLING DATA DESCRIBING POLLUTANTS IN STORM WATER DISCHARGE <br /> North County Recycling Center and Sanitary Landfill has no storm water <br /> discharge sampling data on site. The California Regional Water Quality Control <br /> Board Central Valley Region's Monitoring And Reporting Program No. 91-021 <br /> 5 <br />