Laserfiche WebLink
For the current operations areas at the landfill, the discharges drain into <br /> either the landfill module drainage basin, or one of the three site drainage <br /> basins. The drainage for non-productive areas discharges off site. (See Figure <br /> B) . <br /> There have been no leachate leaks or soil erosion occurrences from the current <br /> 1 - <br /> fill area at the landfill. <br /> 4.0 STORM WATER MANAGEMENT CONTROLS: SWPPP COMPLIANCES <br /> This section discusses the existing storm water management controls and those <br /> necessary for compliance with the SWPPP. <br /> 4_1 SWPPP PERSONNEL <br /> The personnel responsible for implementing, developing, and revising the SWPPP <br /> are indicated in the following: <br /> Site Superintendent: Jaime Perez, North County Recycling Center and <br /> Sanitary Landfill, (209) 468-3066. The Site Superintendent's activities <br /> F... include daily operations, implementing the SWPPP, and employee training. <br /> Facility Engineer: Gabriel Karam, Solid Waste Division, (209) 468-3066. <br /> The Facility Engineer's activities include maintaining records of annual <br /> inspections, materials handling and significant hazardous waste spill <br /> response, and site engineering design. <br /> Environmental Administrative Engineer: Francis Lau, Public Facilities <br /> Division, (209) 468-3086. The Environmental Administrative Engineer's <br /> activities include developing and updating SWPPP as needed. <br /> 8 <br />