My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 11:01:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4_2 PREVENTIVE MAINTENANCE AND GOOD HOUSEKEEPING <br /> SWPPP requires the conveyance storm systems (berms and ditches) be inspected <br /> monthly during the dry season and weekly during the rainy season. Any <br /> r` obstructions, damaged control structures, or debris observed during inspection <br /> i' are to be removed or repaired promptly. Spilled or leaked materials that could <br /> be transported by storm water are also removed, and the source of the spill or <br /> leak is to be eliminated. <br /> Equipment maintenance schedules shall be designed to ensure that site- <br /> associated equipment is operating correctly, minimizing potential spills, <br /> leaks and upset occurrences. Additional maintenance is conducted as needed <br /> when equipment malfunctions are observed. <br /> Vehicle fueling is performed at the fueling area. All vehicles are washed at a <br /> designated wash down area. <br /> f a <br /> General housekeeping and cleaning activities shall be performed daily. Any non <br /> recyclable papers, bags, and small plastic container or materials are picked <br /> up by the end of the day. Litter net fences are kept around the working module <br /> and landfill perimeter at all times. <br /> 4.3 SPILL PREVENTION AND RESPONSE <br /> Since only non hazardous materials are accepted, chance of pollution is <br /> minimal if spills do occur. If any spills occur, landfill personnel are to <br /> take the following actions to supplement the procedures to be used in the site <br /> Hazardous Materials Management Plan (see Appendix B) : <br /> 1) Immediately close off the spill area, the spill is bermed to <br /> prevent contact with any storm drain trenches nearby. <br /> r 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.