My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 11:01:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
materials used, good housekeeping practices within the yard, material <br /> management practices and maintenance of the storm drainage system. The <br /> training shall be accomplished along with the scheduled training sessions <br /> identified in the Hazardous Materials Management Plan (Appendix B) . Also, when <br /> necessary, storm water drainage issues and the SWPPP shall be briefly covered <br /> l:. at morning personnel meetings when assignments are given for the day. <br /> Furthermore, all employees and the public shall have on site access to the <br /> facility's Hazardous Materials Management and SWPPP Plans. <br /> 4_7 INSPECTIONS <br /> The North County Recycling Center and Sanitary Landfill shall be inspected per <br /> the schedule in Section 4.2 for leachate leaks, integrity of the storm water <br /> drainage system, daily covering, and dumping of hazardous materials. <br /> All inspections except for the annual, October 1, inspection shall be done by <br /> the site superintendent. A follow-up compliance procedure shall be used to <br /> i.:.. ensure appropriate response has been taken to an inspection report of SWPPP <br /> deficiency. SWPPP Inspections and maintenance activities shall be documented. <br /> SWPPP Inspection records shall be retained for five (5) years. <br /> An annual facilities inspection shall be conducted by the facility engineer on <br /> or about October 1 of each year. The inspection shall verify that all elements <br /> of the SWPPP are accurate. Additionally, the inspection shall identify any <br /> changes in operations that should be addressed as a revision to the SWPPP. <br /> In addition, the surface storm water runoff on site, if any, is to be <br /> inspected once during the first rain of the wet season, and once during the <br /> first month of the dry season for any stains, sludges, odors, and other <br /> abnormal conditions by the site superintendent. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.