Laserfiche WebLink
2) Contact the Responsible Authorities -- County Office of Emergency <br /> Services Division if the spill is greater than five (5) gallons <br /> and might contain materials which could pollute storm drainage <br /> runoff. Notify the site superintendent for further assistances for <br /> any spill sizes. <br /> 3) Record all significant spills and their corrective actions that <br /> i occur on site in the site special occurrences log. <br /> 4.4 STORM DRAIN SYSTEM <br /> The existing storm system described in Section 2.1 of this Plan provides storm <br /> drainage protection for all industrial process areas and activities currently <br /> taking place at the site. <br /> The North County Recycling Center and Sanitary Landfill's best management <br /> practices are sufficient to satisfy the requirements for this storm water <br /> pollution prevention plan. At the present time, all the site drainage basins <br /> are widen and deepen daily. (See Figure B) . <br /> 4.5 SEDIMENT AND EROSION PREVENTION <br /> Vegetation shall be maintained as needed in surrounding areas of working <br /> modules, and daily compactions to minimize the potential of sediment loading <br /> in storm water runoff. <br /> 4_6 EMPLOYEE TRAINING <br /> The site superintendent is responsible for training employees responsible for <br /> implementing the various aspects of the SWPPP. Employees with SWPPP <br /> responsibilities shall be trained for spill response, handling hazardous <br /> 10 <br />