My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I�� <br />1� <br />�I <br />F <br />r <br />Ci <br />L. Pipes shall be supported independently at the pumps, tanks, and similar <br />locations and such that the weight of pipe is not supported by the equipment. <br />M. Pipe and fittings shall be selected so that there will be as small a deviation as <br />possible at the joints and so that inverts present a smooth surface. Pipe and <br />fittings which do not fit together to form a tight fitting joint will be rejected. <br />N. Carbon steel back-up rings for flanges shall be epoxy painted prior to <br />welding flange stub to pipe. Stainless steel back-up rings do not require <br />painting. Back-up rings shall be protected from damage during welding. <br />3.02 TESTING AND INSPECTION <br />A. The propane gas piping shall be pressure tested to 25 psi pressure with no <br />pressure loss in 8 hours. Regulators, valves, and other items that may be <br />damaged by pressure testing shall be removed by Contractor or disconnected <br />from the pipe. <br />B. The Contractor shall test and check for leaks by hydrotesting LFG pipes in <br />the flare station 75 PSIG for two hours. <br />4.01 MEASUREMENT <br />A. Separate measurement for payment will not be made for work or materials <br />specified in this Section. <br />4.02 PAYMENT <br />A. Separate payment will not be made for work or materials specified in this <br />Section. Full compensation shall be considered as included in the prices paid <br />for Flare Station Construction, and no additional compensation will be <br />allowed or paid. <br />North County LFG Collection System 4 FLARE STATION PIPING <br />San Joaquin County Public Works Section 11552 <br />
The URL can be used to link to this page
Your browser does not support the video tag.