My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3.02 PAINTING <br />A. General <br />1. Surfaces to receive paint shall be prepared in accordance with the <br />paint manufacturer's recommendations and Section 09900 Painting. <br />2. Surfaces requiring paint shall be thoroughly cleaned. Dirt, oil, <br />grease, and other foreign substances shall be removed with solvent <br />and clean cloths. <br />3. Paint shall not be applied to wet, damp, oily or improperly prepared <br />surfaces. <br />B. Surface preparations may be inspected and approved by the Engineer prior <br />to application of paint. The fabricator shall notify the engineer, in writing, <br />seven (7) days prior to initial application of paint. <br />A. Separate measurement for, payment will not be made for work or materials <br />specified in this Section. <br />4.02 PAYMENT <br />A. Separate payment will not be made for work or materials specified in this <br />Section. Full compensation shall be considered as included in the prices paid <br />for Flare Station Construction, and no additional compensation will be <br />allowed or paid. <br />North County LFG Collection System <br />San Joaquin County Public Works <br />4 FLARE STATION BLOWER SKID BASE <br />Section 11553 <br />
The URL can be used to link to this page
Your browser does not support the video tag.