My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />0 <br />I] <br />I 1_ U! � �;_�1 1 I • • <br />A. The Contractor shall use a weighted tape measure to measure well depth <br />and other well dimensions. <br />B. The Engineer shall approve the depth measurement procedures used by the <br />Contractor. The Engineer may verify measurements as he deems appropriate. <br />010 &IF): ufif <br />A. The Contractor shall submit to the Engineer any proposed alternates in <br />accordance with Section 01300. <br />1.04 PERMIT COMPLIANCE <br />A. Contractor shall obtain a Drilling permit from the San Joaquin County <br />Environmental Health Department (EHD). The Contractor shall: <br />1. Submit an application for drilling permit to the Environmental <br />Health Department (EHD), 304 E. Weber Avenue. <br />2. Receive an approved permit from EHD Unit 6, as indicated by the <br />signature of an Environmental Health Unit 6 staff member on the <br />permit. <br />3. Provide a copy of the approved permit to the Engineer prior to <br />drilling. <br />4. Schedule inspection of the well construction with EBD Unit 6 <br />supervisor or lead senior inspector after receiving an approved <br />permit, and at least 48 hour before the need for inspection. Placing <br />of any material in the well bore after drilling requires inspection <br />unless otherwise indicated by EHD staff. Contractor shall receive <br />such indicication in writing. <br />5. Call 209-468-3422 to schedule inspection. Note the name of the <br />person contacted. <br />6. Provide the name of the person in EHD Unit 6 contacted by the <br />driller to schedule inspection to the Engineer in writing. <br />7. Construct the well in the presence of an EHD inspector unless <br />explicitly authorized otherwise by EHD Unit 6. <br />North County LFG Collection System 2 <br />' San Joaquin County Public Works <br />VERTICAL LFG WELLS <br />Section 13901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.