Laserfiche WebLink
11 <br />SECTION 91 <br />WELLHEADLFG <br />PART 1 GENERAL <br />1.01 SUMMARY <br />A. This section covers the minimum requirements for the supply, installation and <br />start-up of the LFG (landfill gas) wellheads. <br />B. Approved manufacturer for the LFG wellhead is Real Environmental Product's <br />wellhead series 3000. <br />1.02 UNIT PRICE <br />A. Unit price for the installation of the LFG wellhead shall be on a per -wellhead <br />basis. <br />0 6uj- 33TI I-VV.1 ►y <br />A. Prior to construction the Contractor shall submit manufacturer's information on <br />the design, materials of construction, installation instructions and start-up <br />procedures. <br />PART 2 MATERIALS <br />2.01 SUMMARY <br />A. This section describes the acceptable materials that shall be used for the <br />construction of the LFG wellhead. <br />A. The LFG wellhead shall be constructed from 2 -inch Schedule 80 PVC and shall <br />include a 2 -inch PVC gate valve, pitot tube monitoring port and thermometer. <br />North County LFG Collection System <br />San Joaquin County Public Works <br />D <br />LFG WELLHEAD <br />Section 13902 <br />