Laserfiche WebLink
PART 3 EXECUTION <br />3.01 GENERAL <br />A. Work shall be performed in accordance with the manufacturer's written procedures <br />and installation detail drawings. <br />3.02 CONNECTIONS <br />A. The LFG wellhead shall be connected to the well using a 4 -inch by 2 -inch rubber <br />coupling with stainless steel clamps. <br />B. The LFG wellhead shall be connected to the lateral using 2 -inch Kanaflex hose <br />with Powerlock clamps. <br />C. The Kanaflex hose shall be painted with white latex paint. <br />4.01 Payment for LFG Wellhead shall be in the basis of unit price for each LFG Wellhead <br />installed as identified in the proposal. The payment shall include startup and testing, pipes, <br />fittings, hoses, valves, well skirt, all necessary hookups and connections as shown on the <br />drawings and specified herein. Payment shall be full compensation for labor, materials, tools, <br />equipment, overhead, and other work and incidentals necessary to complete the work of this <br />Section. Unless authorized by the Owner, the quantity paid shall not exceed the amount shown <br />on the proposal for LFG Wellhead. <br />North County LFG Collection System <br />San Joaquin County Public Works <br />! i 1 <br />N <br />LFG WELLHEAD <br />Section 13962 <br />